Install the AP433e
31
To mount an AP433e above the ceiling with the optional T-bar kit, follow these steps:
1.
Determine the location on the ceiling rails where the AP will be mounted and remove the
ceiling tile.
2.
Unpack the T-bar hanger kit.
3.
Unlock the AP by sliding the locking key into the small hole with an unlocked image above
it.
Figure 12:
Ports and Unlock Mechanism for the AP433e
4.
Attach the square bracket to the underside of the main support bar using the screws pro-
vided, as shown in
Any Fast Ethernet (FE) cables installed in air-handling spaces should be suitable under NEC Article
800.50 and marked accordingly for use in plenums and air-handling spaces with regard to smoke prop-
agation, such as CL2-P, CL3-P, MPP (Multi Purpose Plenum), or CMP (Communications Plenum). Use
Ethernet cable that meets the requirements for operating in plenums and environmental air space in
accordance with Section 300-22(C) of the NEC.
RESET
USB
CONSOLE
G1
Console
port
Ethernet
port
USB
port
00260
Unlock
Содержание AP400 Series
Страница 26: ...Table of Contents xii...
Страница 30: ...Contacting Fortinet 16...
Страница 33: ...AP400 19 Figure 2 AP433e Figure 3 AP433i is RESET CONSOLE G1 USB 00258 00275...
Страница 34: ...AP400 20 Figure 4 OAP433e Outdoor Access Point top and bottom...
Страница 52: ...Where to Go From Here 38...
Страница 66: ...Where to Go From Here 52...
Страница 80: ...Where to Go From Here 66...
Страница 86: ...Warnings 72...
Страница 98: ...Manufacturing Information 84...
Страница 100: ...Supported Power Over Ethernet Devices for Fortinet APs 86...
Страница 102: ...88...