3.2.7.2. Measurements
The boiler is equipped with a tower allowing for air intake/flue gas discharge duct connection (pic. 14 and pic. 15). The tower is designed
with two pre-arranged openings directly accessing air and flue gas ducts (pic. 15).
Remove cap A from the pre-arranged openings on the tower, before starting combustion checking procedure (pic. 14).
In order to verify combustion performance the following measurements must be implemented:
- assess combustion air from no. 1 opening (pic. 15).
- assess flue gas temperature and CO
2
from no. 2 opening (pic. 15).
Allow boiler to reach working temperature before performing any measurement.
pic. 13 –“Chimney sweep” function
pic. 15 - Openings for combustion efficiency
measurement
P6
2
pic. 14 - Air intake and flue gas discharge tower