________________________________________________________________________________
40
AST 14 C 255/00
P24
Post-circulation time at the end of
maintenance cycle
0 ÷ 180 sec
30 sec
P25
Flame propagation time on TFS boiler with
ramp enabled
0 to 4 s
2
P26
DHW water flow measurement
0 ÷ 2
2
0 = flow switch
1 = flowmeter
2 = automatic: mid-
interface, flow switch, top
interface: flowmeter
P27
Gas valve modulation coil short-circuit
control enable
0 ÷ 1
0
0 = disabled
1 = enabled
P91
Boiler overtemperature control
0 ÷ 1
0
0 = double probe
1 = limit thermostat
P92
Post-ventilation timer for TFS boilers after
burner switching off
0 to 60 s
10