3.2.12. Installation of original kits

The manufacturer provides original kits for thermoregulation con-
trol unit installation.
The kits are to be installed as described in their relevant instruction 
manuals. 

3.3. Loading the system

After  completion  of  all  hydraulic  connections  the  central  heating 
system is ready for loading.

Water filling procedure must be performed as follows:

- open air purging valves on the radiators and check operation of 
the boiler automatic air purging valve
- gradually open the boiler water main inlet tap and check operation 
of all air purging valves in the system
-  close  the  air  purging  valves  on  the  radiators  as  soon  as  water 
comes out
-  check  the  water  pressure  gauge  on  boiler,  its  reading  is  not  to 
exceed 1-1.3 bars
- close the water main inlet tap and purge any air still in the system 
through the radiator valves
-  turn the boiler on and wait for the CH system to reach working 
temperature. Stop the pump and purge any left air
- allow the CH system to cool and adjust water pressure to 1-1.3 
bars.

WARNING
 
For  best  performance,  safe,  trouble-free  and  long  lasting  opera-
tion of boiler and its components, in order to minimise energy con-
sumption, thus complying with standards and laws, it is essential to 

treat the water using specific products compatible with multi-metal 

systems.
 
Note
The boiler is equipped, in its front lower section, with a tap for 
unloading water from the system.

WARNING
A low water pressure safety switch prevents burner to ignite when 
water  pressure  is lower  than  0.4 / 0.6 bar. Water  pressure  in  the 
central heating system should not be lower than 1-1.3 bar; resto-
re correct pressure through water mains inlet tap on the boiler as 
necessary.
Water  pressure  adjustment  must  be  performed  when  the  system 
is cold. The thermo-manometer gauge on the boiler allows for che-
cking the pressure in the system.

IMPORTANT: 
After a period of inactivity the pumps could be blocked.
Before switching on the boiler it may be necessary to unlock 
the  pumps  as  follows:  loosen  the  protective  screw  on  the 
pump motor housing, insert a screwdriver in the hole and then 
manually rotate the pump shaft clockwise.
After restoring pump operation, tighten the protective screw 
and check for water leaks.

WARNING
When removing the pump protective screw a little water may 
leak out. Before replacing the cover of the boiler dry any wet 
surfaces.

3.4 Starting the boiler

3.4.1 Preliminary checks

Prior to starting the boiler verify the following:

- correct installation of flue gas outlet duct and terminal section: 

when the boiler is operating, no flue gas leaks are to be 

detected.
- power supply to the boiler must be 230 V- 50 Hz;

- system is correctly filled with water (manometer reading is to be 

1-1.3 bars);
- any cut-off taps in the system are to be open;
 - the gas type supplied matches the gas type for which the boiler 
has been calibrated: otherwise, convert the boiler to the gas type 
available (see section 3.6: “SWITCHING TO DIFFERENT GAS 
AND BURNER ADJUSTMENT“): this operation is to be performed 

by qualified technicians;

- the gas supply tap is open;
- no gas leaks are detected;
- the power switch external to the boiler is on;
- no water leaks are detected
- the pumps are not blocked
- the boiler’s safety valve is not locked;

WARNING

The boiler pump is factory set to III speed and the by-pass is closed. 
Adjust them following the system requirements.

3.4.2 On/Off switching 

To switch the boiler on and off follow the indications in the “In-
structions to the user”.

18

Содержание BALI B BTFSE 24

Страница 1: ...IST 03 C 192 01 INSTALLATION USE AND MAINTENANCE BALI B BTNE 25 BTNE 32 BTNE 42 BTFSE 24 BTFSE 32 BTFSE 36 GB...

Страница 2: ...Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly 1...

Страница 3: ...ment sites Keep the packaging out of the reach of children as by its nature it may represent a hazard In the event of failure and or faulty functioning switch off the boiler Do not attempt to repair i...

Страница 4: ...of temperature probes page 9 1 3 Maintenance page 9 1 4 Information for the user page 9 2 Technical characteristics and dimensions page 10 2 1 Technical characteristics page 10 2 2 Dimensions page 10...

Страница 5: ...operates in CH and instantaneous DHW supply mode only As soon as the probe is replaced the boiler will resume operation 8 Indication light red when the light is on and fixed it indicates that the temp...

Страница 6: ...liters per minute relies upon the boiler thermal output and water main supply temperature according to the fol lowing formula l DHW in liters per minute K T K represents 344 for BTFS 24 model 459 for...

Страница 7: ...t when the boiler is equipped with an external temperature probe the user sets a fictitious room temperature va lue via knob 13 please see SLIDING TEMPERATURE OPERA TION section Knob 13 is used to adj...

Страница 8: ...of the week current time ON and OFF pro grams please see below sections B and C B Setting the day of the week and current time Position selector 2 to RUN and press h and m buttons at the same time unt...

Страница 9: ...will be displayed fixed and symbol will be displayed indicator 4 now the chan nel will be permanently active Rapidly set selector 1 to position O without stopping in position AUTO press once or twice...

Страница 10: ...usehold products Do not use water As provided by law the boiler is to be serviced once a year Correct maintenance ensures boiler to function efficiently environmentally friendly preventing any danger...

Страница 11: ...aracteristics High output cast iron heat exchanger Stainless steel plate DHW heat exchanger Stainless steel horizontal stratification 60 l water tank with sacrificial magnesium anode Glass wool alumin...

Страница 12: ...inlet C DHW flow F Cold water inlet M CH flow R CH return G Gas inlet C DHW flow F Cold water inlet M CH flow R CH return M1 Low temperature zone flow M2 Low temperature zone return D Flue gas outlet...

Страница 13: ...CAST HEAT EXCHANGER BURNER Plate heat exchanger probe Zone 1 high temperature Thermostatic valve DHW Cold water inlet Water tank probe Water tank VM 2 way Cold water inlet Zone 1 high temperature Zon...

Страница 14: ...16 4 Water tank capacity l 60 60 60 60 60 60 DHW supply T 30K EN 625 l 10 220 242 280 215 245 253 prEN 13203 efficiency rating Min DHW flow rate l min 3 3 3 3 3 3 Min DHW pressure bar 1 1 1 1 1 1 Max...

Страница 15: ...manual Four legs with threads 3 2 2 Choosing where to install the boiler When choosing where to install the boiler follow the instructions below indications in paragraph 3 2 5 Air flue gas system conf...

Страница 16: ...lination toward the ground of at least 5 The terminal is to ensure efficient constant evacuation of flue gas in any weather condition The flue gas terminal is to stand at least 0 5 m above any adjacen...

Страница 17: ...0 mm diameter split pipes Roof mounted flue gas terminal Allowable configuration for max length of split pipes 2 flanged stub pipes 1 meter long air intake pipe 30 meter long flue gas pipe 1 air intak...

Страница 18: ...damage or injury cau sed by failure to properly earth the power main Gas lines DHW and CH pipes are not suitable for earthing purpo ses 3 2 9 Hydraulic connections Before connecting the boiler it is a...

Страница 19: ...through water mains inlet tap on the boiler as necessary Water pressure adjustment must be performed when the system is cold The thermo manometer gauge on the boiler allows for che cking the pressure...

Страница 20: ...er P3 boiler operating mode selector P2 DHW temperature adjusting potentiometer P1 CH temperature adjusting potentiometer IG two poled main power switch BC flame detection pcb VG gas valve E RIV flame...

Страница 21: ...NECTION M1 M24 AVAILABLE CONNECTORS X1 X8 AVAILABLE CONNECTORS CT PHONE CONNECTION DEVICE OPTIONAL EQUIPMENT FUSE SP 2 AF 250 Vac FUSE FUSE SZ 2 5 AF 250 Vac FUSE P4 HIGH TEMPERATURE CH CURVES ADJUSTI...

Страница 22: ...ted by qualified personnel In order to verify nozzle and gas inlet pressure connect a mano meter to checks on the gas valve Boilers are factory set according to gas type requested upon order Any later...

Страница 23: ...the plate heat exchanger The boiler has shut down and red light no 4 is flashing Restore correct water pressure Insufficient water pressure Possible water leaks Check system for leaks Pressure switch...

Страница 24: ...has not sufficient pressu re or flow rate Check DHW system Check flow meter filter Flow meter sensor is faulty or discon nected Replace or reconnect it Flow meter is blocked Replace it Burner does not...

Страница 25: ...24...

Страница 26: ...25...

Страница 27: ...26...

Страница 28: ...ax 39 0365 878 576 e mail fondital fondital it www fondital it The MANUFACTURER reserves the right to implement any necessary and or useful variation to products without modifying fundamental characte...

Отзывы: