background image

13 

BTN 25

BTN 32

BTN 42

BTFS 24

BTFS 32

BTFS 36

Category

-

II2H3+

II2H3+

II2H3+

II2H3+

II2H3+

II2H3+

Type

-

B11BS

C12 - C32 - C42 - C52 - C82

Number of elements of primary heat exchanger

-

4

5

6

3

4

4

Number of nozzles of burner

-

3

4

5

3

3

3

Max heat input

kW

27.87

34.80

47.00

26.6

34.4

39.2

Max heat output

kW

25.05

31.40

42.54

24.0

32.0

36.5

Max output efficiency rate

%

89.9

90.22

90.51

90.20

93.10

93.10

Reduced output efficiency rate (30% of max output)

%

89.0

90.00

89.75

89.23

92.08

92.14

92/42/CEE efficiency rating

-

Casing heat loss

%

0.40

0.50

0.50

2.20

1.90

1.50

Flue gas heat loss with burner on

%

9.7

9.28

8.99

7.6

5

5.4

CH min. flow rate 

l/h

540

690

900

520

690

780

Min. CH water pressure

bar

0.8

0.8

0.8

0.8

0.8

0.8

Max CH water pressure

bar

3

3

3

3

3

3

Max CH water temperature

°C

90

90

90

90

90

90

Min. CH water temperature

°C

40

40

40

40

40

40

Capacity of expansion vessel

l

12

12

18

12

12

12

Max CH system capacity

l

240

240

360

240

240

240

Water content

l

16.4

19.8

23

13

16.4

16.4

Water tank capacity

l

60

60

60

60

60

60

DHW supply

 Δ

T=30K EN 625

l/10’

220

242

280

215

245

253

prEN 13203 efficiency rating

-

Min. DHW flow rate

l/min

3

3

3

3

3

3

Min. DHW pressure

bar

1

1

1

1

1

1

Max DHW pressure

bar

6

6

6

6

6

6

Max DHW water temperature

°C

65

65

65

65

65

65

Min. DHW water temperature

°C

50

50

50

50

50

50

Capacity of DHW expansion vessel

l

5

5

5

5

5

5

CH Flow/return pipe diameter

inches

G1

G1

G1

G1

G1

G1

DHW inlet/outlet pipe diameter

inches

G3/4

G3/4

G3/4

G3/4

G3/4

G3/4

Gas inlet diameter

inches

G1/2

G1/2

G1/2

G1/2

G1/2

G1/2

Flue gas pipe diameter

mm

130

150

150

--

--

--

Air/flue gas coaxial pipe system diameter

mm

--

--

--

100/60

100/60

100/60

Air/flue gas split pipe system diameter

mm

--

--

--

80+80

80+80

80+80

Voltage/frequency

V/Hz

230/50

230/50

230/50

230/50

230/50

230/50

Power consumption

W

160

200

200

200

250

250

Power fuse

A

4

4

4

4

4

4

Control panel protection rating

IP

X4D

X4D

X4D

X4D

X4D

X4D

Height

mm

1370

1370

1370

1370

1370

1370

Length

mm

600

600

600

600

600

600

Depth

mm

800

800

800

800

800

800

Net boiler weight

Kg

172

189

206

189

223.5

223.5

2.4. Operational data

Burner pressures must be verified after a three minute boiler operation time

Содержание BALI B BTFSE 24

Страница 1: ...IST 03 C 192 01 INSTALLATION USE AND MAINTENANCE BALI B BTNE 25 BTNE 32 BTNE 42 BTFSE 24 BTFSE 32 BTFSE 36 GB...

Страница 2: ...Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly 1...

Страница 3: ...ment sites Keep the packaging out of the reach of children as by its nature it may represent a hazard In the event of failure and or faulty functioning switch off the boiler Do not attempt to repair i...

Страница 4: ...of temperature probes page 9 1 3 Maintenance page 9 1 4 Information for the user page 9 2 Technical characteristics and dimensions page 10 2 1 Technical characteristics page 10 2 2 Dimensions page 10...

Страница 5: ...operates in CH and instantaneous DHW supply mode only As soon as the probe is replaced the boiler will resume operation 8 Indication light red when the light is on and fixed it indicates that the temp...

Страница 6: ...liters per minute relies upon the boiler thermal output and water main supply temperature according to the fol lowing formula l DHW in liters per minute K T K represents 344 for BTFS 24 model 459 for...

Страница 7: ...t when the boiler is equipped with an external temperature probe the user sets a fictitious room temperature va lue via knob 13 please see SLIDING TEMPERATURE OPERA TION section Knob 13 is used to adj...

Страница 8: ...of the week current time ON and OFF pro grams please see below sections B and C B Setting the day of the week and current time Position selector 2 to RUN and press h and m buttons at the same time unt...

Страница 9: ...will be displayed fixed and symbol will be displayed indicator 4 now the chan nel will be permanently active Rapidly set selector 1 to position O without stopping in position AUTO press once or twice...

Страница 10: ...usehold products Do not use water As provided by law the boiler is to be serviced once a year Correct maintenance ensures boiler to function efficiently environmentally friendly preventing any danger...

Страница 11: ...aracteristics High output cast iron heat exchanger Stainless steel plate DHW heat exchanger Stainless steel horizontal stratification 60 l water tank with sacrificial magnesium anode Glass wool alumin...

Страница 12: ...inlet C DHW flow F Cold water inlet M CH flow R CH return G Gas inlet C DHW flow F Cold water inlet M CH flow R CH return M1 Low temperature zone flow M2 Low temperature zone return D Flue gas outlet...

Страница 13: ...CAST HEAT EXCHANGER BURNER Plate heat exchanger probe Zone 1 high temperature Thermostatic valve DHW Cold water inlet Water tank probe Water tank VM 2 way Cold water inlet Zone 1 high temperature Zon...

Страница 14: ...16 4 Water tank capacity l 60 60 60 60 60 60 DHW supply T 30K EN 625 l 10 220 242 280 215 245 253 prEN 13203 efficiency rating Min DHW flow rate l min 3 3 3 3 3 3 Min DHW pressure bar 1 1 1 1 1 1 Max...

Страница 15: ...manual Four legs with threads 3 2 2 Choosing where to install the boiler When choosing where to install the boiler follow the instructions below indications in paragraph 3 2 5 Air flue gas system conf...

Страница 16: ...lination toward the ground of at least 5 The terminal is to ensure efficient constant evacuation of flue gas in any weather condition The flue gas terminal is to stand at least 0 5 m above any adjacen...

Страница 17: ...0 mm diameter split pipes Roof mounted flue gas terminal Allowable configuration for max length of split pipes 2 flanged stub pipes 1 meter long air intake pipe 30 meter long flue gas pipe 1 air intak...

Страница 18: ...damage or injury cau sed by failure to properly earth the power main Gas lines DHW and CH pipes are not suitable for earthing purpo ses 3 2 9 Hydraulic connections Before connecting the boiler it is a...

Страница 19: ...through water mains inlet tap on the boiler as necessary Water pressure adjustment must be performed when the system is cold The thermo manometer gauge on the boiler allows for che cking the pressure...

Страница 20: ...er P3 boiler operating mode selector P2 DHW temperature adjusting potentiometer P1 CH temperature adjusting potentiometer IG two poled main power switch BC flame detection pcb VG gas valve E RIV flame...

Страница 21: ...NECTION M1 M24 AVAILABLE CONNECTORS X1 X8 AVAILABLE CONNECTORS CT PHONE CONNECTION DEVICE OPTIONAL EQUIPMENT FUSE SP 2 AF 250 Vac FUSE FUSE SZ 2 5 AF 250 Vac FUSE P4 HIGH TEMPERATURE CH CURVES ADJUSTI...

Страница 22: ...ted by qualified personnel In order to verify nozzle and gas inlet pressure connect a mano meter to checks on the gas valve Boilers are factory set according to gas type requested upon order Any later...

Страница 23: ...the plate heat exchanger The boiler has shut down and red light no 4 is flashing Restore correct water pressure Insufficient water pressure Possible water leaks Check system for leaks Pressure switch...

Страница 24: ...has not sufficient pressu re or flow rate Check DHW system Check flow meter filter Flow meter sensor is faulty or discon nected Replace or reconnect it Flow meter is blocked Replace it Burner does not...

Страница 25: ...24...

Страница 26: ...25...

Страница 27: ...26...

Страница 28: ...ax 39 0365 878 576 e mail fondital fondital it www fondital it The MANUFACTURER reserves the right to implement any necessary and or useful variation to products without modifying fundamental characte...

Отзывы: