Instructions for the installer
24
3. Instructions for the installer
3.1 Installation standards
This boiler must be installed in compliance with the laws and standards in force in the country of installation, which are herein consi
-
dered as entirely transcribed.
To find out about the gas category and technical specifications, refer to operation data and general features specified in the previous
pages.
DANGER
Accessories and spare parts for installation and service procedures are to be supplied by the Manufacturer.
Should non original accessories and spare parts be employed, boiler proper performance is not guaranteed.
3.1.1
Packaging
Boiler is shipped in a sturdy cardboard box.
Remove boiler from cardboard box and check its integrity.
The packing materials can be recycled. Disposal must be managed via appropriate waste collection sites.
Keep packaging out of reach of children, as it may be dangerous.
The manufacturer shall not be held responsible in case of damage to people, animals, or property due to failure to follow the above
mentioned instructions.
Packaging includes one plastic bag containing:
• boiler installation, use and maintenance manual;
• the template for mounting the boiler on a wall (see
Fig. 7 Paper template).
•
2 screws and relevant wall blocks for fixing the boiler to the wall;
•
3 diaphragms for flue gas venting: diameters 39.8; 44 and 49 mm (CTFS only);
3.2 Choosing where to install the boiler
The following must be taken into account when choosing where to install the boiler:
• indications contained in paragraph
Air intake and flue gas venting system
on page
27
and its sub-paragraphs.
• check the wall for sturdiness, avoiding weak areas.
•
do not install the boiler over appliances which may affect boiler operation (e.g. cookers, which produce steam and grease, washing
machines etc.).
• do not install boilers in locations with a corrosive or very dusty atmosphere, such as hairdresser salons, laundries etc., as this may
severely reduce the lifespan of the components of the boiler.
• avoid installing the air intake terminal in rooms or areas with corrosive or very dusty atmosphere to protect the heat exchanger.
3.3 Positioning the boiler
Each boiler is supplied with a paper template, found inside the packaging (see
Fig. 7 Paper template).
The template allows you to ensure that the pipes connected to the CH system, the DHW system and the gas mains, and the air intake/
flue gas venting ducts are all laid out correctly during the realisation of the water system and before installation of the boiler.
This template is made of heavy-duty paper and must be fixed, with the help of a level, onto the wall where the boiler is to be mounted.
The template provides all the indications required to drill the boiler mounting holes to the wall, procedure which is done using two
screws and wall blocks.
The lower area of the template shows where to mark the exact point at which the couplings are to be positioned for boiler connection
to the gas supply pipe, cold water mains supply pipe, hot water outlet, CH flow and return pipes.
The upper area of the template shows where air intake and flue gas ducts are to be positioned.
Содержание ANTEA CTFS 13 AF
Страница 53: ...53 Page left intentionally blank ...
Страница 54: ...54 Page left intentionally blank ...
Страница 55: ...55 Page left intentionally blank ...