
34
Handler I, II & III Operator’s Manual - October 2008
Dry Product: (recirculation
not available/not used)
Close all valves and open lid.
With all valves closed, start nurse pump to draw fresh water
from water supply tank.
Figure H2-5.1
Move handle on Main Valve from closed position to venturi
position, (See Figure H2-5.1)
Figure H2-5.6
Open Agitation Valve to allow water to flow from agitation
jet, (See Figure H2-5.6)
1.
2.
3.
4.
Figure H2-5.2
Open Venturi Valve to allow suction from Handler tank,
(See Figure H2-5.2)
Pour powder or dry product slowly into tank and stream of
water discharging from agitation jet. Dry product will mix
with water swirling in bottom of Handler tank and then will
be drawn away by venturi. Be careful not to pour too much
product at any one time as this may cause plugging of the
anti-vortex fitting in tank bottom.
See Tank Cleanout instructions above
Batch mix/Premix liquids,
powders and granules
(recirculation/pump package required
- Handler II and III only)
Close all valves and open lid on Handler.
Figure H2-5.8
Position handle on Pump Suction Valve to draw fresh water,
start nurse pump to draw fresh water from water supply
tank, (See Figure H2-5.8)
5.
6.
•
1.
2.
Содержание Handler I
Страница 2: ......
Страница 48: ...48 Handler I II III Operator s Manual October 2008...