
32
Handler I, II & III Operator’s Manual - October 2008
Plunge container into tank and puncture on knife. Push
container down with consistent, even force to cut the bottom
and then allow to drain. (See Figure H2-5.3)
HINT: puncture to one side of bottom (stay away from
the centre as this is usually the thickest part of the
container) and make sure knife cuts up side wall of
container.
Figure H2-5.7
Hold punctured container on knife and open Container
Rinse Valve to rinse container, (See Figure H2-5.7) Repeat
until container is thoroughly rinsed. Then close Container
Rinse Valve and remove container.
Repeat steps # 5 and #6 until all containers have been
rinsed.
Tank Cleanout Instructions
Handler I Tank Cleanout
Replace lid and open Container Rinse Valve to rinse Han-
dler tank. When rinsing is complete, close Container Rinse
Valve to stop water flow into Handler tank.
NOTE: rinse water is being continuously sent off to
sprayer as rinsing is occurring.
5.
•
6.
7.
1.
•
Figure H1-5.7a
Figure H1-5.7b
To fill the remainder of the sprayer tank, close Venturi
Valve and open Main Valve. (See Fig H1-5.7a and H1-
5.7b). All valves, except Main Valve, should now be
closed. This terminates the water flowing to and from the
Handler tank allowing fresh water from the source tank to
bypass the venturi system and finish filling the sprayer tank.
When desired sprayer tank volume is achieved, close Main
Valve.
2.
3.
Shown in open position
Shown in open position
Содержание Handler I
Страница 2: ......
Страница 48: ...48 Handler I II III Operator s Manual October 2008...