3. Divide the lapsed time in days (between steps 1 and 2) by the anode weight loss in
grams to get the calculated anode consumption rate (days/gram).
If multiple anodes were weighed, then use the anode which has lost the most weight
for this calculation.
4. Calculate future replacement intervals so that they occur when the selected fraction of
zinc is remaining.
Start the pump
CAUTION: Crush Hazard
The starting jerk can be powerful. Make sure nobody is close to the unit when it is started.
NOTICE:
Make sure that the rotation of the impeller is correct. For more information, see Check the
impeller rotation.
1. Check the oil level in the oil housing.
2. Remove the fuses or open the circuit breaker, and check that the impeller can be
rotated freely.
WARNING: Crush Hazard
Never put your hand into the pump housing.
3. Conduct insulation test phase to ground. To pass, the value must exceed 5
megaohms.
4. Check that the monitoring equipment works.
5. Start the pump.
Operation
30
Flygt 3126.290 Installation, Operation, and Maintenance Manual