
CHAR
GE
Industrial ScopeMeter®
Get Started
Note
Get Started
Before you use your Test Tool for the first time, read this
The power adapter does not damage the Test
Tool even when connected over consecutive
section.
days. The power adapter automatically switches
Battery Pack
to a trickle charge.
Li-ion batteries may be discharged at delivery. Completely
discharged batteries can cause the Test Tool not to start
1
up when it is turned on. To reach full charge, charge for 4
hours with the Test Tool turned off.
When fully charged, the batteries provide up to 7 hours
2
(single channel, time base slower than 1 µs/div) of use
when the backlight is dimmed.
The battery status shows as an icon in the top right
3
corner of the screen:
b
- full charge
- about 5 minutes of operation remains
hxv51.eps
To charge the batteries and power the instrument, connect
Figure 2. Battery Charging
the power adapter as shown in Figure 2. To charge the
batteries more quickly, turn off the Test Tool.
W
Caution
To prevent overheating of the batteries
during charging, do not exceed the allowable
ambient temperature in the specifications.
7
Содержание ScopeMeter 123B
Страница 8: ...123B 124B 125B U ivatelsk p ru ka vi...
Страница 10: ...123B 124B 125B U ivatelsk p ru ka viii...
Страница 104: ...123B 124B 125B Users Manual vi...
Страница 106: ...123B 124B 125B Users Manual viii...
Страница 123: ...4 Industrial ScopeMeter Scope and Meter Mode A B 5 A B hxv04 eps Figure 8 Correct Grounding Setup 17...
Страница 124: ...6 7 123B 124B 125B Users Manual A B 10 mV A 1 mV A hxv57 eps Figure 9 Temperature and Current Measurement Setup 18...