www.flowair.com
| 17
1.20.
Rotating the module NWS/NWL
The supply air module is delivered to the site of delivery upside down. Before placing the module on the base, be careful when
turning it in the corect position as to not demage the module.
In order the secure module when turning it please use the styrofoam cover which comes with the module.
Place the air supply module carefully in horizontal position, then attach the ropes to the prepared lugs and start lifting it carefully
usinig steroform cover as a protective base a spacially seciuring the corners.
The polystyrene cover should not be removed before turning over NW supply module. Storing the device without the
polystyrene cover may damage the actuator.
Содержание Rooftop Cube
Страница 1: ...www flowair com 1 Rooftop Cube SHORT ASSEMBLY INSTRUCTION v1 1 EN ...
Страница 2: ...2 www flowair com 01 2022r ...
Страница 57: ...www flowair com 57 Cube 80 100 Cube 80_100 L Cube 120 160 Cube R8 ...
Страница 59: ...www flowair com 59 01 2022r ...