50 |
www.flowair.com
Cube R8
The power cord of the device should be led through the prepared hole to the automation cabinet cover. Then the cable should be
connected to the ZUG terminals as described in the further part of the description.
Cube R8 NWS
The power cord of the device should be led through the prepared hole in the supply air module. Then the cable should be
connected to the ZUG terminals as described in the further part of the description.
All activities during connecting to electrical installation must be conducted by qualified staff, having necessary
permissions and certificates to work with live electrical devices according to the laws of the country.
Содержание Rooftop Cube
Страница 1: ...www flowair com 1 Rooftop Cube SHORT ASSEMBLY INSTRUCTION v1 1 EN ...
Страница 2: ...2 www flowair com 01 2022r ...
Страница 57: ...www flowair com 57 Cube 80 100 Cube 80_100 L Cube 120 160 Cube R8 ...
Страница 59: ...www flowair com 59 01 2022r ...