36 |
www.flowair.com
The upper nodes should be screwed M10 with single bolts and the access from the inspection side is available when the door
panel of the heat recovery module [3] is removed and on the opposite side through the inspection hole specially prepared for this
purpose [4]. The entire load of the rotor shall rest on the ropes attached to the crane until all screws are fastened Previous removal
of the load may result in damage to the device and/or breaking of the bolts.
3.
During installation, remember to route the power and control harness and connect the wires in the electrical box.
4.
Be sure to route the power cord from the heat recovery module to the unit.
The Cube 120/160 R / Cube 80/100 L cannot be raised with the heat recovery module attached. Installation of the heat
recovery module to the Cube device should be done on the roof, after mounting the Cube device. Installation is carried
out in accordance with the guidelines presented later in this manual.
Содержание Rooftop Cube
Страница 1: ...www flowair com 1 Rooftop Cube SHORT ASSEMBLY INSTRUCTION v1 1 EN ...
Страница 2: ...2 www flowair com 01 2022r ...
Страница 57: ...www flowair com 57 Cube 80 100 Cube 80_100 L Cube 120 160 Cube R8 ...
Страница 59: ...www flowair com 59 01 2022r ...