Assembly
5.3 Mounting the CMS
S6300-01en
Edition 10/2022
43
• Seal unused cable glands against dust.
• For electrical insulation: Note the connection assignment.
• Insulate the cables if required.
• Expose the shielding and lay the shielding according to chapter Electrical connection
• Attach the cables as indicated in the wiring diagram or plug them into the corresponding
slots.
• Tighten the PG cable glands.
During installation, observe the tightening torques for the screwed connections as specified
in the following table.
Screw type
Tightening torque
Description
M4
3 Nm
Earthing
M8
25 Nm
Control cabinet assembly on the wall
Table 5-1:
Screw fasteners
5.3.2
Assembling the sensors
5.3 Mounting the CMS
5.3.2.1
Safety information for mounting the sensors
5.3 Mounting the CMS
DANGER
Danger to life due to electric shock
Electric shock results in fatal injuries.
•
Prior to starting work, switch off the power supply to the system via the mains discon-
nection device.
•
Secure the system against being switched on accidentally.
•
Close the mains disconnection device and put up warning signs.
•
Ensure all work is carried out by trained and authorised specialist personnel only, ob-
serving the safety instructions and the applicable accident prevention regulations.
•
When working around rotating parts, also press an emergency stop button.
Information
Support during assembly
If you need assistance with assembling the sensors, contact Service and Support
(Page 65).
Ensuring the sensors are correctly fastened and in the right position is crucial to the meas-
uring accuracy.
•
Ensure that the sensors are tightly connected to the measuring points specified in the
gear unit documentation.
•
Do not use sheet metal, plastic or thin components for the sensor assembly.
Содержание DX2000+
Страница 1: ...Operating instructions S6300 01en Edition 10 2022 DX2000 ...
Страница 6: ...Table of contents 6 Edition 10 2022 S6300 01en Index 79 ...
Страница 8: ...List of figures 8 Edition 10 2022 S6300 01en ...
Страница 10: ...List of tables 10 Edition 10 2022 S6300 01en ...
Страница 14: ...Introduction 1 4 Copyright 14 Edition 10 2022 S6300 01en ...
Страница 22: ...Safety information 2 12 Notes on special types of hazards 22 Edition 10 2022 S6300 01en ...
Страница 40: ...Application planning 4 3 Application planning 40 Edition 10 2022 S6300 01en ...
Страница 54: ...Commissioning 6 1 Commissioning 54 Edition 10 2022 S6300 01en ...
Страница 58: ...Operator control 7 4 Faults 58 Edition 10 2022 S6300 01en ...
Страница 64: ...Maintenance 8 6 Maintenance schedule 64 Edition 10 2022 S6300 01en ...
Страница 66: ...Service Support 9 2 Technical return address 66 Edition 10 2022 S6300 01en ...
Страница 68: ...Disposal 10 4 Scrapping 68 Edition 10 2022 S6300 01en ...
Страница 70: ...Declaration of conformity EU Declaration of Conformity 70 Edition 10 2022 S6300 01en ...
Страница 76: ...Technical specifications Environmental conditions 76 Edition 10 2022 S6300 01en ...
Страница 78: ...Annex Software 78 Edition 10 2022 S6300 01en ...
Страница 80: ...Index 80 Edition 10 2022 S6300 01en ...
Страница 81: ......