Cable designation
Conductor cross
section
AWG
Comment
Ethernet
-
-
CAT5 or higher
Analogue input
0.14 ... 0.75 mm
26 ... 20
-
Digital input / output
26 ... 20
-
Accelerometer cable
26 ... 20
See Connecting the
cable shield (Page 42)
Table 5-2:
Requirements for parameters
5.5.3
Connecting the cable shield
5.5 Electrical connection
Figure 5-2:
Example of assembly of the shield connector, before
Figure 5-3:
Example of assembly of the shield connector, after
• Connect the following process signals of the device to sensor signals and analogue in-
puts via shielded cables. You have to put on their shields.
• Attach the shields of the cables to the earth terminals using the shield connectors.
1. Insulate the cable across the width of the shield connector.
2. Pull the shield braid back over the cable sheath.
3. Insert the connecting conductor into the shield connection terminal.
4. Fix the terminal by pressing on the suspension bracket.
5. Crimp the shield connector until both ends overlap and it is firmly positioned on the
cable. The connecting conductor must also be firmly positioned.
6. Ensure that no shield braids or cores of the connection cable can protrude from the outer
insulation of the shield connector and, in doing so, come into contact with other parts.
7. Connect the connection cable to the terminal of the earthing block in the con-
trol cabinet according to the wiring diagram.
Содержание DX2000+
Страница 1: ...Operating instructions S6300 01en Edition 10 2022 DX2000 ...
Страница 6: ...Table of contents 6 Edition 10 2022 S6300 01en Index 79 ...
Страница 8: ...List of figures 8 Edition 10 2022 S6300 01en ...
Страница 10: ...List of tables 10 Edition 10 2022 S6300 01en ...
Страница 14: ...Introduction 1 4 Copyright 14 Edition 10 2022 S6300 01en ...
Страница 22: ...Safety information 2 12 Notes on special types of hazards 22 Edition 10 2022 S6300 01en ...
Страница 40: ...Application planning 4 3 Application planning 40 Edition 10 2022 S6300 01en ...
Страница 54: ...Commissioning 6 1 Commissioning 54 Edition 10 2022 S6300 01en ...
Страница 58: ...Operator control 7 4 Faults 58 Edition 10 2022 S6300 01en ...
Страница 64: ...Maintenance 8 6 Maintenance schedule 64 Edition 10 2022 S6300 01en ...
Страница 66: ...Service Support 9 2 Technical return address 66 Edition 10 2022 S6300 01en ...
Страница 68: ...Disposal 10 4 Scrapping 68 Edition 10 2022 S6300 01en ...
Страница 70: ...Declaration of conformity EU Declaration of Conformity 70 Edition 10 2022 S6300 01en ...
Страница 76: ...Technical specifications Environmental conditions 76 Edition 10 2022 S6300 01en ...
Страница 78: ...Annex Software 78 Edition 10 2022 S6300 01en ...
Страница 80: ...Index 80 Edition 10 2022 S6300 01en ...
Страница 81: ......