Flash Technology
Revision A - 2/13/2020
36
FH 270 FLASHHEAD INSTALLATION
FLASHHEAD (FH 270) WIRING
Remove the white and blue caps found on either end of the supplied pre-terminated flashhead cable. Connect
each FH 270 Panel to the PC 270. Verify connection points by looking at the stickers on each cable end. The
connector requires a quarter turn to lock into place. Twist the connector end clockwise to ensure it is in the full-
unlocked position prior to connecting to the FH 270 or PC 270. Failure to perform this step could result in poor
cable termination or bent connector pins.
FLASHHEAD (FH 270) M OUNTING
The FH 270 mounts directly to the bracket assembly shown below. The bracket uses two u-bolts to attach to the
tower leg. The bracket will come fully assembled from the factory.
BRACKET ASSY FH 270
FLASHHEAD (FH 270) AIMING
Utilizing the tilt mechanism on each FH 270 panel, adjust the light to the appropriate angle using the table found
below. Each panel has a leveling indicator on the sides of the panels.
Tier Level-Above Ground Level (AGL)
Elevation Angle
0 to 300 feet (91 meters)
3°
301 to 400 feet (122 meters)
2°
401 to 500 feet (152 meters)
1°
500 feet and higher
0°