General Instructions and Regulations
Seite/Page 20 - Kaptitel/Chapter 1: General Instructions and Regulations
8.10.14
1.3
Manufacturer declaration in accordance with the Machinery Directive
2006/42/EC
Manufacturer declaration in accordance with the Machinery Directive 2006/42/EC
The generator was designed in such a way that all assemblies correspond with the CE guidelines. If Machinery
Directive 2006/42/EC is applied, then it is forbidden to start the generator until it has been ascertained that the
system into which the generator is to be integrated also complies with the Machinery Directive 2006/42/EC. This
includes the exhaust system, cooling system and electrical installations.
The evaluation of “protection against contact“ must be carried out when installed, in conjunction with the respective
system. This also includes correct electrical connections, a safe ground wire connection, foreign body and humidity
protection, protection against moisture due to excessive condensation, as well as overheating through appropriate
and inappropriate use of the equipment in its installed state. The responsibility for implementing these measures lies
with those who undertake the installation of the generator in the final system.
1.4
Customer registration and guarantee
Use the advantages of registering your product:
• you will receive a Guarantee Certificate after approval of your installation data
• you will receive extended product information that may be relevant to safety.
• You will receive free upgrades as necessary.
Additional advantages:
Based on your complete data record, Fischer Panda technicians can provide you with fast assistance, since 90 % of
the disturbances result from defects in the periphery.
Problems due to installation errors can be recognized in advance.
1.4.1 Technical support
Technical Support via the Internet: [email protected]
1.4.2 Caution, important information for start-up!
1. The commissioning log shall be filled in immediately after initial operation and shall be confirmed by signature.
2. The commissioning log must be received by Fischer Panda GmbH at Paderborn within 4 weeks of initial
operation.
3. After receiving the commissioning log, Fischer Panda will make out the official guarantee certificate and send it to
the customer.
4. If warranty claims are made, the document with the guarantee certification must be submitted.
If the above requirements are not or only partly fulfilled, the warranty claim shall become void.
Содержание 45i pms
Страница 3: ...8 10 14 Kapitel Chapter A Seite Page 3...
Страница 4: ...Seite Page 4 Kaptitel Chapter A 8 10 14...
Страница 12: ...Seite Page 12 Kaptitel Chapter 1 8 10 14...
Страница 148: ...Generator Failure Seite Page 148 Kaptitel Chapter 8 Generator Failure 8 10 14...
Страница 160: ...Tables Seite Page 160 Kaptitel Chapter 9 Tables 8 10 14...
Страница 176: ...Inverter Panda PMGi 45 Seite Page 176 Kaptitel Chapter 10 Inverter Panda PMGi 45 8 10 14...
Страница 204: ...Seite Page 204 Kapitel Chapter 3 Installation 8 10 14 Leere Seite Intentionally blank Installation...
Страница 206: ...Seite Page 206 Kapitel Chapter 4 Maintenance 8 10 14 Leere Seite Intentionally blank Maintenance...
Страница 212: ...Seite Page 212 Kapitel Chapter 6 Annex 8 10 14 Leere Seite Intentionally blank Annex...