Seite/Page 38 Grundlagen_deu.R01 - Kapitel/Chapter 3:
10.5.11
• Connect battery. Close battery main switch.
• Hold stop lever on generator motor in neutral position and crank starter for approx. 10 seconds. Then, pause for 10
seconds. Repeat this procedure 2 times.
• Perform visual check of the generator similar to initial commissioning and start up generator.
Note:
Fischer Panda recommends:
After extended downtimes, a full 150 h inspection as per the
inspection list should be performed.
3.4
Содержание 22-4 HD PVMV-N
Страница 8: ...Seite Page 8 Kapitel Chapter 2 10 5 11 12 Measurements 153 12 1 Hole pattern 153 ...
Страница 25: ...General Instructions and Regulations 10 5 11 Chapter 1 General Instructions and Regulations Page 25 ...
Страница 52: ...Seite Page 52 10 5 11 Leere Seite Intentionally blank The Panda Generator ...
Страница 94: ...Seite Page 94 Panda 8000 42NE PVMV N R01 10 5 11 Leere Seite Intentionally blank Maintenance Instructions ...
Страница 154: ...Seite Page 154 Panel Generator Control P6 RE0703_Kunde_eng R06 1 10 5 11 Leere Seite Intentionally blank Measurements ...