
STAKS Crossover Casegoods by FIRST OFFICE |
39
All wall panels, worksurfaces and worksurface supports (including drawer pedestals), must be
in final installed position and securely assembled before installing shared overhead units.
1. Position shelf/organizer in desired location.
2. Align brackets with pockets.
3. Lift shelf/organizer and securely tighten all socket head screws with 3/16" Allen wrench.
4. Check press fit brackets to ensure they are securely affixed to panels for maximum rigidity.
5. Screw brackets to shelf/organizer.
Shared Shelf/Organizer Installation
96
48
32
16
Midpoint
TWO BRACKETS
96
48
30
60
Midpoint
THREE BRACKETS
PLACE BRACKETS
ON PANELS.
DO NOT TIGHTEN!
POCKETS
TIGHTEN
Содержание STAKS
Страница 1: ...STAKS Crossover Casegoods ASSEMBLY INSTRUCTIONS...
Страница 5: ...STAKS Crossover Casegoods by FIRST OFFICE 5 Wall Panels PREPARATION X PANEL CONNECTION...
Страница 6: ...STAKS Crossover Casegoods by FIRST OFFICE 6 Wall Panels PREPARATION T 2 PANEL CONNECTION...
Страница 7: ...STAKS Crossover Casegoods by FIRST OFFICE 7 Wall Panels PREPARATION IN LINE PANEL TO PANEL CONNECTION...
Страница 8: ...STAKS Crossover Casegoods by FIRST OFFICE 8 Wall Panels PREPARATION L PANEL CONNECTION...
Страница 20: ...STAKS Crossover Casegoods by FIRST OFFICE 20 Pedestal Installation...
Страница 50: ...an OFS Brands company 1204 East Sixth Street Huntingburg IN 47542 800 983 4415 firstoffice com 11 16...