
STAKS Crossover Casegoods by FIRST OFFICE |
24
Electrical Installation
8 WIRE ELECTRICAL INSTALLATION
Refer to electrical plan drawing for:
•
Electrical Components Needed
•
Locations of Electrical Components
•
Grommet Hole Locations
1. Refer to electrical plan drawing to determine grommet locations.
2. Drill 2 3/8" diameter holes through panels where indicated.
3. Install grommets in panels.
4. Power infeed must be installed by licensed electrician.
Model# DSCGB-1
(ships separately)
Содержание STAKS
Страница 1: ...STAKS Crossover Casegoods ASSEMBLY INSTRUCTIONS...
Страница 5: ...STAKS Crossover Casegoods by FIRST OFFICE 5 Wall Panels PREPARATION X PANEL CONNECTION...
Страница 6: ...STAKS Crossover Casegoods by FIRST OFFICE 6 Wall Panels PREPARATION T 2 PANEL CONNECTION...
Страница 7: ...STAKS Crossover Casegoods by FIRST OFFICE 7 Wall Panels PREPARATION IN LINE PANEL TO PANEL CONNECTION...
Страница 8: ...STAKS Crossover Casegoods by FIRST OFFICE 8 Wall Panels PREPARATION L PANEL CONNECTION...
Страница 20: ...STAKS Crossover Casegoods by FIRST OFFICE 20 Pedestal Installation...
Страница 50: ...an OFS Brands company 1204 East Sixth Street Huntingburg IN 47542 800 983 4415 firstoffice com 11 16...