
STAKS Crossover Casegoods by FIRST OFFICE |
28
6. Refer to electrical plan drawing to determine components needed and locations for components.
7. Route jumpers through cable management holes in cantilever brackets and through grommet
holes in panels.
8. Snap blocks and jumpers together to create chain according to electrical plan drawing.
9. Attach power infeed to chain.
10. Leave chain in place until worksurfaces and pedestals have been installed.
Electrical Installation
4 WIRE ELECTRICAL INSTALLATION
Содержание STAKS
Страница 1: ...STAKS Crossover Casegoods ASSEMBLY INSTRUCTIONS...
Страница 5: ...STAKS Crossover Casegoods by FIRST OFFICE 5 Wall Panels PREPARATION X PANEL CONNECTION...
Страница 6: ...STAKS Crossover Casegoods by FIRST OFFICE 6 Wall Panels PREPARATION T 2 PANEL CONNECTION...
Страница 7: ...STAKS Crossover Casegoods by FIRST OFFICE 7 Wall Panels PREPARATION IN LINE PANEL TO PANEL CONNECTION...
Страница 8: ...STAKS Crossover Casegoods by FIRST OFFICE 8 Wall Panels PREPARATION L PANEL CONNECTION...
Страница 20: ...STAKS Crossover Casegoods by FIRST OFFICE 20 Pedestal Installation...
Страница 50: ...an OFS Brands company 1204 East Sixth Street Huntingburg IN 47542 800 983 4415 firstoffice com 11 16...