First Office STAKS Скачать руководство пользователя страница 38

STAKS Crossover Casegoods by FIRST OFFICE   |   

38

1.  Drill two holes on the underside of the upper worksurface 1/8" diameter by 1/8" deep for 

mini-fix bolt.

2.  Screw mini-fix bolt into predrilled holes.

3.  Attach T-support to upper worksurface by aligning the mini-fix bolts with the mini-fix 

cams on the T-support.

4.  Secure mini-gix by turning mini-fix cams clock-wise one half turn.

5.  Continue with steps 4-10 on riser support installation instructions on previous page.

Worksurface Installation

T-SUPPORT INSTALLATION

Содержание STAKS

Страница 1: ...STAKS Crossover Casegoods ASSEMBLY INSTRUCTIONS...

Страница 2: ...1 4 Cantilever Placement a Low Height Tops 22 b Worksurface Height Tops 23 5 Electrical Installation a 8 Wire Electrical Installation 24 26 b 4 Wire Electrical Installation 27 29 6 Straightener Rail I...

Страница 3: ...EL CLIP WHEN MACHINED ON EDGE OF PANEL 1 SHOULDER SCREW USE WHEN CLIP POCKET IS MACHINED ON EDGE OF PANEL 5 8 SHOULDER SCREW USE WHEN CLIP POCKET IS MACHINED ON FACE OF PANEL T CONNECTION SCREW BLOCK...

Страница 4: ...STAKS Crossover Casegoods by FIRST OFFICE 4 Wall Panels PREPARATION T 3 PANEL CONNECTION Use Panel Connector Kits PCK 1 or PCK 5 for 33 35...

Страница 5: ...STAKS Crossover Casegoods by FIRST OFFICE 5 Wall Panels PREPARATION X PANEL CONNECTION...

Страница 6: ...STAKS Crossover Casegoods by FIRST OFFICE 6 Wall Panels PREPARATION T 2 PANEL CONNECTION...

Страница 7: ...STAKS Crossover Casegoods by FIRST OFFICE 7 Wall Panels PREPARATION IN LINE PANEL TO PANEL CONNECTION...

Страница 8: ...STAKS Crossover Casegoods by FIRST OFFICE 8 Wall Panels PREPARATION L PANEL CONNECTION...

Страница 9: ...STAKS Crossover Casegoods by FIRST OFFICE 9 Wall Panels PREPARATION T 3 PANEL CONNECTION 2 42 OR 48 Tall Panels Connected to 1 33 Panel...

Страница 10: ...STAKS Crossover Casegoods by FIRST OFFICE 10 Wall Panels PREPARATION X PANEL CONNECTION 2 42 OR 48 Tall Panels Connected to 2 33 Panel...

Страница 11: ...STAKS Crossover Casegoods by FIRST OFFICE 11 Wall Panels PREPARATION INTERSECTION HIGH POINT OF FLOOR INTERSECTION 2 48 Tall Panels Connected to 1 42 Panel...

Страница 12: ...for locations of panels power infeeds and data ports 1 Check power and data locations before assembling panels 2 Panel assemblies can be moved more easily before other components are installed 3 Acces...

Страница 13: ...on the wall panel installation instructions on the proceeding page to determine where the starter post needs to be located on the wall 1 Remove or cut away any base molding or carpet base so starter...

Страница 14: ...floor where the three panels are to meet 2 Position levelers in the holes of the lower gauge 3 Place upper gauge on top edge of panels with panels against panel stop 4 The upper gauge will temporaril...

Страница 15: ...ilot bore two holes at worksurface height 3 Use two screws in slotted holes on cantilever bracket 4 Make sure top of bracket is 27 3 8 from bottom edge of panel adjust if needed 5 Use two more screws...

Страница 16: ...ree from slides 4 Secure pedestal to top using screws 5 If applicable secure to wall panel using pedestal bracket LATERAL FILE DRAWER REMOVAL 1 Open drawer to full extension 2 Remove shipping screw fr...

Страница 17: ...destals must be removed for access to screw holes for pedestal installation 1 Remove drawer below shelf 2 Remove four screws from L brackets that hold shelf in place 3 Do not remove screws from end pa...

Страница 18: ...side to side 2 Pilot bore and screw pedestals together using 8 x 1 1 4 flat head screws Hardware Kit HK 3 3 Place riser beam on pedestal assembly with 4 spacing on both sides and 2 spacing on the fro...

Страница 19: ...Pedestals 2 Pairs 24 30 36 Wide Pedestals FOLD DOWN BACK 30 Wide Pedestal UNFINISHED BACK 24 Wide Pedestal UNFINISHED BACK 36 Wide Pedestal UNFINISHED BACK 16 Wide Pedestal FINISHED BACK 16 Wide Pede...

Страница 20: ...STAKS Crossover Casegoods by FIRST OFFICE 20 Pedestal Installation...

Страница 21: ...STAKS Crossover Casegoods by FIRST OFFICE 21 Pedestal Installation PEDESTAL ATTACHED TO END PANEL Pedestal Attached to End Panel...

Страница 22: ...Place pedestals in place DO NOT attach to panels at this time 2 Position cantilever brackets as shown on bracket drawing 3 Any span of over 42 between supports needs an additional cantilever bracket...

Страница 23: ...n place DO NOT attach to panels at this time 2 Position cantilever brackets as shown on bracket drawing 3 Any span of over 42 between supports needs an additional cantilever bracket 4 Use two screws i...

Страница 24: ...for Electrical Components Needed Locations of Electrical Components Grommet Hole Locations 1 Refer to electrical plan drawing to determine grommet locations 2 Drill 2 3 8 diameter holes through panels...

Страница 25: ...ng to determine components needed and locations for components 6 Route jumpers through cable management holes in cantilever brackets and through grommet holes in panels 7 Snap blocks and jumpers toget...

Страница 26: ...place 3 Repeat for all blocks 4 Refer to electrical plan drawing for locations of receptacles 5 Match circuit numbers to electrical plan drawing 6 If receptacle locations do not match plan drawing ci...

Страница 27: ...Components Grommet Hole Locations 1 Refer to electrical plan drawing to determine grommet locations 2 Drill 2 3 8 diameter holes through panels where indicated 3 Install grommets in panels 4 Power inf...

Страница 28: ...jumpers through cable management holes in cantilever brackets and through grommet holes in panels 8 Snap blocks and jumpers together to create chain according to electrical plan drawing 9 Attach power...

Страница 29: ...e of each receptacle 3 If receptacle locations do not match plan drawing circuits can be overloaded 4 Hold receptacle in specified location against bottom of worksurface and pencil mark clip location...

Страница 30: ...R54 for 55 60 unsupported area use Hardware Kit HK 22 SPTR60 for 61 66 unsupported area use Hardware Kit HK 23 SPTR66 for 67 78 unsupported area use Hardware Kit HK 25 1 Center the rail in the unsuppo...

Страница 31: ...STAKS Crossover Casegoods by FIRST OFFICE 31 12 x 3 4 PAN HEAD TOP FACE DOWN USER EDGE BACK APPROACH EDGE POSITION BASE OFF BACK APPROACH EDGE 1 32 1 32 H Base Installation...

Страница 32: ...x 5 8 pan head screws Hardware Kit HK 11 25 L BRACKET MODULAR END PANEL MODULAR BACK PANEL WING END ASSEMBLY 1 Position wing end assembly flush to edge and back of top 2 Screw L brackets to top using...

Страница 33: ...e back panel support in center of span between supports pedestals cantilevers etc 2 Screw to back panel and worksurface using 10 x 5 8 pan head screws Hardware Kits HK 10 HK 11 WALL PANEL SUPPORT ITEM...

Страница 34: ...faces before placing them on cantilever brackets 2 Some worksurfaces need to be connected before being placed on brackets and pedestals see next page 3 Consult worksurface plan drawing for proper plac...

Страница 35: ...35 Clamp plates available from item CP 1 Hardware Kit HK 6 1 Attach clamp plates 2 Connect spine wall worksurfaces 3 Attach run off worksurfaces 4 Secure worksurfaces to cantilever brackets Worksurfa...

Страница 36: ...Hardware Kit HK 2 27 3 8 to bottom of end panel for worksurface height 21 3 8 to bottom of end panel for low height 2 Move storage tower into position 3 Back of storage tower should be flush to back e...

Страница 37: ...d align upper top with lower top 5 Pencil mark corners of riser support 6 Remove upper top with attached riser support 7 Bore three 3 16 holes through lower top Holes should be 1 2 to the inside of th...

Страница 38: ...ew mini fix bolt into predrilled holes 3 Attach T support to upper worksurface by aligning the mini fix bolts with the mini fix cams on the T support 4 Secure mini gix by turning mini fix cams clock w...

Страница 39: ...organizer in desired location 2 Align brackets with pockets 3 Lift shelf organizer and securely tighten all socket head screws with 3 16 Allen wrench 4 Check press fit brackets to ensure they are secu...

Страница 40: ...ace organizer on shelf 2 Position organizer on shelf so bottom is flush with shared shelf 3 Replace shelf screws with longer screws provided with organizer Hardware Kit HK 16 Shared Shelf Organizer In...

Страница 41: ...e ACRYLIC MODESTY INSTALLATION 1 Assemble modesty brackets with screw caps to modesty panel by screwing bolts through bracket acrylic modesty panel and into screw caps Hardware Kit HK 17 2 Reverse bra...

Страница 42: ...CE 42 1 Attach brackets Item WEBKT 1 WEBKT 2 to modesty panel 2 Tighten screws 3 Attach assembled modesty panel to approach edge of worksurface 4 Tighten screws Modesty Installation FRONT EDGE MODESTY...

Страница 43: ...dge of panel 2 Assemble two halves of brackets with privacy panel between two halves 3 Tighten screws to secure panel in place 4 Hang completed assembly on top edge of wall panel leaving 1 gap on eith...

Страница 44: ...mbly on top edge of spine wall panel leaving 1 gap on either side of privacy panel 5 Panel and bracket locations may vary Consult plan drawings 6 Position brackets Item WPPBKT 1 on front and back edge...

Страница 45: ...at this time 4 Screw bottom flange to wall panel Hardware Kit HK 24 5 Lift top section of tackboard away from toolbar 6 Screw top flange to wall panel 7 Peel backers off of velcro strips 8 Carefully...

Страница 46: ...lying on its back 2 Center tackboard on organizer and mark corner location with masking tape 3 Remove paper backing on factory installed velcro strips 4 Align tackboard with previously marked corners...

Страница 47: ...de of tack board 3 Bore mounting holes in wall hanger 4 Line up bottom of wall bracket with scribed line on wall and mark location of fasteners 5 Attach to wall with appropriate fasteners for wall con...

Страница 48: ...king form Dual Lock strips to expose adhesive 3 Position cushion where desired with back edge flush to back edge of case 4 Usually the cushion will also be flush to the side of the case 5 There will b...

Страница 49: ...zontal line line A using a carpenter s level 3 Draw another line line B 6 1 4 below line A This is where the mounting rail will be fastened to the wall 4 Drill holes for appropriate wall fasteners thr...

Страница 50: ...an OFS Brands company 1204 East Sixth Street Huntingburg IN 47542 800 983 4415 firstoffice com 11 16...

Отзывы: