
STAKS Crossover Casegoods by FIRST OFFICE |
34
1 1/2"
GAP
NO
GAP
Worksurface Installation
TOP PLACEMENT
1. Determine location of worksurfaces before placing them on cantilever brackets.
2. Some worksurfaces need to be connected before being placed on brackets and
pedestals (see next page).
3. Consult worksurface plan drawing for proper placement.
4. Verify if 1 1/2" cable management gap is required or if worksurfaces are to mounted
directly to wall panels.
NO
GAP
1 1/2"
GAP
Содержание STAKS
Страница 1: ...STAKS Crossover Casegoods ASSEMBLY INSTRUCTIONS...
Страница 5: ...STAKS Crossover Casegoods by FIRST OFFICE 5 Wall Panels PREPARATION X PANEL CONNECTION...
Страница 6: ...STAKS Crossover Casegoods by FIRST OFFICE 6 Wall Panels PREPARATION T 2 PANEL CONNECTION...
Страница 7: ...STAKS Crossover Casegoods by FIRST OFFICE 7 Wall Panels PREPARATION IN LINE PANEL TO PANEL CONNECTION...
Страница 8: ...STAKS Crossover Casegoods by FIRST OFFICE 8 Wall Panels PREPARATION L PANEL CONNECTION...
Страница 20: ...STAKS Crossover Casegoods by FIRST OFFICE 20 Pedestal Installation...
Страница 50: ...an OFS Brands company 1204 East Sixth Street Huntingburg IN 47542 800 983 4415 firstoffice com 11 16...