
STAKS Crossover Casegoods by FIRST OFFICE |
14
The 120° Tool Kit is item number TOOL-3.
1. Place lower gauge on the floor where the three panels are to meet.
2. Position levelers in the holes of the lower gauge
3. Place upper gauge on top edge of panels with panels against panel stop.
4. The upper gauge will temporarily hold panels in place until secured by cantilevers
and worksurfaces.
Wall Panels
120° CORNER UNIT INSTALLATION
Содержание STAKS
Страница 1: ...STAKS Crossover Casegoods ASSEMBLY INSTRUCTIONS...
Страница 5: ...STAKS Crossover Casegoods by FIRST OFFICE 5 Wall Panels PREPARATION X PANEL CONNECTION...
Страница 6: ...STAKS Crossover Casegoods by FIRST OFFICE 6 Wall Panels PREPARATION T 2 PANEL CONNECTION...
Страница 7: ...STAKS Crossover Casegoods by FIRST OFFICE 7 Wall Panels PREPARATION IN LINE PANEL TO PANEL CONNECTION...
Страница 8: ...STAKS Crossover Casegoods by FIRST OFFICE 8 Wall Panels PREPARATION L PANEL CONNECTION...
Страница 20: ...STAKS Crossover Casegoods by FIRST OFFICE 20 Pedestal Installation...
Страница 50: ...an OFS Brands company 1204 East Sixth Street Huntingburg IN 47542 800 983 4415 firstoffice com 11 16...