
STAKS Crossover Casegoods by FIRST OFFICE |
18
Pedestal Preparation
RISER BEAM INSTALLATION
1. Turn pedestals upside down and place side to side.
2. Pilot bore and screw pedestals together using #8 x 1 1/4" flat head screws
(Hardware Kit HK-3).
3. Place riser beam on pedestal assembly with 4" spacing on both sides and 2"
spacing on the front.
4. Attach riser beam to pedestal assembly by screwing L-brackets to pedestals using
#8 x 5/8" pan head screws (Hardware Kit HK-9).
Содержание STAKS
Страница 1: ...STAKS Crossover Casegoods ASSEMBLY INSTRUCTIONS...
Страница 5: ...STAKS Crossover Casegoods by FIRST OFFICE 5 Wall Panels PREPARATION X PANEL CONNECTION...
Страница 6: ...STAKS Crossover Casegoods by FIRST OFFICE 6 Wall Panels PREPARATION T 2 PANEL CONNECTION...
Страница 7: ...STAKS Crossover Casegoods by FIRST OFFICE 7 Wall Panels PREPARATION IN LINE PANEL TO PANEL CONNECTION...
Страница 8: ...STAKS Crossover Casegoods by FIRST OFFICE 8 Wall Panels PREPARATION L PANEL CONNECTION...
Страница 20: ...STAKS Crossover Casegoods by FIRST OFFICE 20 Pedestal Installation...
Страница 50: ...an OFS Brands company 1204 East Sixth Street Huntingburg IN 47542 800 983 4415 firstoffice com 11 16...