Weatherproof procedures
40 HotPoint 5200 Access Point Hardware Installation Guide
Note:
To make a strong watertight connection, keep a high level of tension in the
butyl mastic when you stretch it over the cable and connector.
6.
Tightly wrap a layer of mastic tape over the electrical tape. Make a 40%
overlap on each turn. Start from the base of the unit to at least 2.5 cm (1
inch) of the cable.
7.
Wrap a layer of electrical tape (smooth side out, sticky side in) over the
mastic tape.
8.
Wrap a second layer of electrical tape over the first layer of electrical tape.
The lightning arrestor connections are ready for installation in an outdoor
environment.