Version: July 2020
16
How to lay River Rocks Firebed
– GD6 1400 & 1600
•
Lay large rocks first, in these positions.
•
Lay small rocks next, in these positions.
•
Using the remote control, switch the appliance ON, following the
‘GD6 Operating Instructions’
in this guide
to check how flame looks. The flame will take 20-25 seconds to light fully.
•
IMPORTANT:
the flame effect should look natural and non-uniform, running the entire length of the burner.
•
Common flame effect issues are:
•
Flame touching edge of burner tray.
•
Missing flames along length of burner.
•
Both these issues can be resolved by switching the appliance OFF and slightly repositioning rocks and
logs at the problem areas. Follow the
‘GD6 Operating Instructions’
in this guide.
•
Repeat this switching On/Off and repositioning until a natural and non-uniform flame effect is achieved.
•
Once a natural and non-uniform flame effect is achieved, switch the appliance to the lowest setting and
ensure the flame effect, although smaller, still looks good.
•
Using the remote control, switch the appliance OFF following the
‘GD6 Operating Instructions’
in this
guide.
•
Switch the wall isolation switch to the appliance OFF.