CIE-A-200 Control Panel Engineering and Commissioning Manual
64
Commissioning Checklist
The following checklist may be used to ensure that all steps are taken. It serves as a reminder only and may
need additional items added if required.
Step 1
Description
Commissioning
Engineer
Checked
LOOP 1
Low voltage test meter shows 0v and earth continuity, and no inter-core short
circuits. (+ve core will only have continuity if link pins fitted instead of devices.
LEGACY DEVICES ONLY
)
All devices installed and initialised in sections until entire system is initialised
satisfactorily.
All faults (device, input, output, EOL, battery, etc,) cleared from control panel.
Correct operation and device poll verified using Sita DIAGNOSTIC.
Step 2
Data Uploaded to PC.
Configuration set up on PC.
Data downloaded to control panel.
Addressable loop reconfigured.
System Reset.
All ancillary inputs and outputs connected and faults cleared.
Step 3
Correct operation of all input devices tested, ie, detectors, manual call points and
inputs.
Correct operation of all output devices tested, ie, sounders, relays and outputs.
Correct operation of all programmed actions tested, ie, instant, delays,
confirmation alarms, multi-stages.
Step 4
System Manuals completed, zone chart or zone list displayed.
End user or responsible person trained and user manual issued.
Site Name & Address:
Commissioning Company:
Commissioning Engineer:
Signature:
Date: