3. Installation
3−3
Festo P.BE−CPASC−EN en 0412b
Contents of this chapter
This chapter deals with the tubing and wiring of the CPA−SC
valve terminal. The following belong here:
general instructions on preparing the compressed air and
the tubing
instructions on pilot control of the valve solenoid coils
with internal or external pilot air
instructions on operating the valve terminals with
pressure−zone separation
notes on vacuum/low pressure operation
fitting the QS screw connectors
connecting the power supply
earthing the valve terminal
address assignment of the valves
Further information
Instructions on connecting the electric multipin can be found
in the leaflet supplied with the product.
Содержание Smart cubic CPA-SC Series
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPASC EN en 0412b...
Страница 16: ...Contents and general instructions XIV Festo P BE CPASC EN en 0412b...
Страница 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0412b Chapter 1...
Страница 41: ...Fitting 2 1 Festo P BE CPASC EN en 0412b Chapter 2...
Страница 53: ...Installation 3 1 Festo P BE CPASC EN en 0412b Chapter 3...
Страница 81: ...Commissioning 4 1 Festo P BE CPASC EN en 0412b Chapter 4...
Страница 98: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0412b...
Страница 99: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0412b Chapter 5...
Страница 112: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0412b...
Страница 113: ...Technical appendix A 1 Festo P BE CPASC EN en 0412b Appendix A...
Страница 129: ...Index B 1 Festo P BE CPASC EN en 0412b Appendix B...
Страница 130: ...B Index B 2 Festo P BE CPASC EN en 0412b Contents B Index B 1...
Страница 136: ...B Index B 8 Festo P BE CPASC EN en 0412b W Weights A 4...