2. Installation and interfaces
2-5
Festo P.BE-CTEU-DN-OP+MAINT-EN en 1206NH
2. Plug the bus node onto the valve terminal in the right
position and without tilting.
3. First, lightly screw in the three self-tapping screws with a
TORX screwdriver (size T10): use existing threads, if ap-
plicable.
4. Tighten the screws with 1.0 Nm.
Содержание CTEU-DN
Страница 2: ......
Страница 15: ...Introduction 1 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 1 Introduction...
Страница 22: ...1 Introduction 1 8 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 23: ...Installation and interfaces 2 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 2 Installation and interfaces...
Страница 44: ...2 Installation and interfaces 2 22 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 45: ...Preparing for commissioning 3 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 3 Preparing for commissioning...
Страница 57: ...Commissioning 4 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 4 Commissioning...
Страница 76: ...4 Commissioning 4 20 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 77: ...Diagnostics 5 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 5 Diagnostics...
Страница 90: ...5 Diagnostics 5 14 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 91: ...Error handling 6 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 6 Error handling...
Страница 98: ...6 Error handling 6 8 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 99: ...Technical appendix A 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Appendix A Technical appendix...
Страница 124: ...A Technical appendix A 26 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 125: ...Index B 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Appendix B Index...
Страница 126: ...B Index B 2 Festo P BE CTEU DN OP MAINT EN en 1206NH Contents B Index B 1...
Страница 130: ...B Index B 6 Festo P BE CTEU DN OP MAINT EN en 1206NH...