
3. Preparing for commissioning
3-7
Festo P.BE-CTEU-DN-OP+MAINT-EN en 1206NH
LED display
Status and significance
PS
illuminates green:
– Voltage supply (Power System, PS) is OK
– Operating voltage applied
(in the approved range)
– Load voltage present (in the approved range)
1)
X1/X2
illuminates green:
– Device is correctly connected to the bus node
– Internal communication between bus node and
device 1 or device 2 is error free
2)
– Operating and load voltage present (in the ap-
proved range)
1)
MNS
flashes green:
– Fieldbus communication present (“online” operat-
ing status), but not configured
(in this case
OK because
bus node
not
configured)
IO
is off:
– Commissioning of the bus node and fieldbus
connection not complete or not successful
(
OK because
in this case the bus node is
not yet
configured,
i.e. the configuration of the bus node
via the PLC has not yet been executed)
1)
Display depends on whether the connected device monitors the
load voltage and reports to the bus node
2)
Separate accessory with two interfaces for connection of an addi-
tional device required
Tab. 3/10:
Status LEDs after switch on – bus node
not con-
figured
Содержание CTEU-DN
Страница 2: ......
Страница 15: ...Introduction 1 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 1 Introduction...
Страница 22: ...1 Introduction 1 8 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 23: ...Installation and interfaces 2 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 2 Installation and interfaces...
Страница 44: ...2 Installation and interfaces 2 22 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 45: ...Preparing for commissioning 3 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 3 Preparing for commissioning...
Страница 57: ...Commissioning 4 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 4 Commissioning...
Страница 76: ...4 Commissioning 4 20 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 77: ...Diagnostics 5 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 5 Diagnostics...
Страница 90: ...5 Diagnostics 5 14 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 91: ...Error handling 6 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 6 Error handling...
Страница 98: ...6 Error handling 6 8 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 99: ...Technical appendix A 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Appendix A Technical appendix...
Страница 124: ...A Technical appendix A 26 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 125: ...Index B 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Appendix B Index...
Страница 126: ...B Index B 2 Festo P BE CTEU DN OP MAINT EN en 1206NH Contents B Index B 1...
Страница 130: ...B Index B 6 Festo P BE CTEU DN OP MAINT EN en 1206NH...