5. Diagnostics
5-13
Festo P.BE-CTEU-DN-OP+MAINT-EN en 1206NH
The table below shows the composition of the diagnostic in-
formation (status byte). Additional information can be found
in the Appendix.
Bit
Significance
Explanation
0
I-Port Module Error
I-port device/module reports diagnostics status
1
I-Port Configuration Error
– Connected device/module is not compatible with
I-port
– I-port device/module interchanged during opera-
tion
– I/O data length not reached/exceeded
2
Communication Error
I-port communication error during operation, e.g. if
the I-port device/module was unplugged
3
Undervoltage PS
Undervoltage in the power supply
4
Undervoltage PL
I-port device/module reports undervoltage in the load
supply
5
Overload/Short Circuit Module
I-port device/module reports short circuit or overload
6
Overload/Short Circuit I-Port
Short circuit or overload at I-port
7
Other Error
Other faults:
Tab. 5/7:
Explanation on the diagnostic information (significance of I-port status byte –
Festo diagnostic object – Class code 103
d
)
5.4.2
Short circuit/overload
Short circuit or overload monitoring depends on the connec-
ted I-port device: When the I-port device monitors the load
voltage and I-port connection for short circuit and overload,
corresponding error messages are generated and forwarded
to the PLC. On the bus node, the “PS” LED flashes green,
showing a malfunction in the operating and load voltage sup-
ply (
Tab. 5/2).
More extensive information can be found in the product docu-
mentation on the I-port device.
Содержание CTEU-DN
Страница 2: ......
Страница 15: ...Introduction 1 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 1 Introduction...
Страница 22: ...1 Introduction 1 8 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 23: ...Installation and interfaces 2 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 2 Installation and interfaces...
Страница 44: ...2 Installation and interfaces 2 22 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 45: ...Preparing for commissioning 3 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 3 Preparing for commissioning...
Страница 57: ...Commissioning 4 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 4 Commissioning...
Страница 76: ...4 Commissioning 4 20 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 77: ...Diagnostics 5 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 5 Diagnostics...
Страница 90: ...5 Diagnostics 5 14 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 91: ...Error handling 6 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Chapter 6 Error handling...
Страница 98: ...6 Error handling 6 8 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 99: ...Technical appendix A 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Appendix A Technical appendix...
Страница 124: ...A Technical appendix A 26 Festo P BE CTEU DN OP MAINT EN en 1206NH...
Страница 125: ...Index B 1 Festo P BE CTEU DN OP MAINT EN en 1206NH Appendix B Index...
Страница 126: ...B Index B 2 Festo P BE CTEU DN OP MAINT EN en 1206NH Contents B Index B 1...
Страница 130: ...B Index B 6 Festo P BE CTEU DN OP MAINT EN en 1206NH...