2. Commissioning
2-3
Festo P.BE-CPV-CO3-EN en 1201a
2.1
Preparing the CPV valve terminal for commissioning
2.1.1
Switching on the operating voltages
Note
Please observe the switching-on instructions in the manual
for your PLC controller.
•
Before switching on, make sure that the field bus has
been configured completely and correctly as specified.
Observe the following points before switching on the power
supply:
Common supply
Provide a common power supply for the control system and
all field bus slaves via a central power unit or a central switch.
Separate supply
If the control system and the field bus slaves have separate
power supplies, the devices must be switched on in the fol-
lowing sequence:
1. the operating voltage supply for all field bus slaves
2. the operating voltage supply for the controller.
Содержание CPV...-GE-CO3-8 series
Страница 2: ......
Страница 14: ...Contents and general instructions XII Festo P BE CPV CO3 EN en 1201a...
Страница 15: ...Installation 1 1 Festo P BE CPV CO3 EN en 1201a Chapter 1 Installation...
Страница 59: ...Commissioning 2 1 Festo P BE CPV CO3 EN en 1201a Chapter 2 Commissioning...
Страница 78: ...2 Commissioning 2 20 Festo P BE CPV CO3 EN en 1201a...
Страница 79: ...Diagnosis and error treatment 3 1 Festo P BE CPV CO3 EN en 1201a Chapter 3 Diagnosis and error treatment...
Страница 98: ...3 Diagnosis and error treatment 3 20 Festo P BE CPV CO3 EN en 1201a...
Страница 104: ...A Technical appendix and accessories A 6 Festo P BE CPV CO3 EN en 1201a A 3 Accessories www festo com catalogue...
Страница 105: ...Object directories B 1 Festo P BE CPV CO3 EN en 1201a Appendix B Object directories...
Страница 129: ...Examples C 1 Festo P BE CPV CO3 EN en 1201a Appendix C Examples...
Страница 136: ...C Examples C 8 Festo P BE CPV CO3 EN en 1201a...
Страница 137: ...Index D 1 Festo P BE CPV CO3 EN en 1201a Appendix D Index...
Страница 138: ...D Index D 2 Festo P BE CPV CO3 EN en 1201a Contents D Index D 1...