3. Diagnosis and error treatment
3-3
Festo P.BE-CPV-CO3-EN en 1201a
3.1
Diagnosis via LEDs
The LEDs on the cover indicate the operating status of the
CPV valve terminal.
1
2
3
1
LED PS: “Power System”: Operating
voltage supply for the
electronics and sensors
LED PL: “Power Load”: Load voltage
supply for the valves
(and valves/outputs in the
CPI/CP extension string)
2
LED MNS: Module/network status
LED
P
:
CPI system fault or
other error messages
3
Yellow LEDs for pilot solenoids
12 and 14
Fig. 3/1:
LEDs on the CPV Direct
Representation
of the LEDs
In the following overviews the different states of the LEDs
are represented by icons:
LED lights up;
LED flashes;
LED off.
Содержание CPV...-GE-CO3-8 series
Страница 2: ......
Страница 14: ...Contents and general instructions XII Festo P BE CPV CO3 EN en 1201a...
Страница 15: ...Installation 1 1 Festo P BE CPV CO3 EN en 1201a Chapter 1 Installation...
Страница 59: ...Commissioning 2 1 Festo P BE CPV CO3 EN en 1201a Chapter 2 Commissioning...
Страница 78: ...2 Commissioning 2 20 Festo P BE CPV CO3 EN en 1201a...
Страница 79: ...Diagnosis and error treatment 3 1 Festo P BE CPV CO3 EN en 1201a Chapter 3 Diagnosis and error treatment...
Страница 98: ...3 Diagnosis and error treatment 3 20 Festo P BE CPV CO3 EN en 1201a...
Страница 104: ...A Technical appendix and accessories A 6 Festo P BE CPV CO3 EN en 1201a A 3 Accessories www festo com catalogue...
Страница 105: ...Object directories B 1 Festo P BE CPV CO3 EN en 1201a Appendix B Object directories...
Страница 129: ...Examples C 1 Festo P BE CPV CO3 EN en 1201a Appendix C Examples...
Страница 136: ...C Examples C 8 Festo P BE CPV CO3 EN en 1201a...
Страница 137: ...Index D 1 Festo P BE CPV CO3 EN en 1201a Appendix D Index...
Страница 138: ...D Index D 2 Festo P BE CPV CO3 EN en 1201a Contents D Index D 1...