TST
Assembly instructions
FUZ2 -A/-B/-C/-CX/-G/-L
FEIG ELECTRONIC GmbH
Page 57 of 96
TST_FUZ2-A-B-C-CX-G-
L_Montageanleitung_EN_22.docx
7.5 Expansion card RFUxK
Expansion board TST RFUxK can optionally be plugged in and has additional 6 inputs and 6 relay outputs
and one digital output, with freely programmable operation. In addition, a 2-channel inductive loop detector
and an annual timer switch as well as an additional RS-485 interface are included, e.g. for connection to a
partner controller
Figur 38: TST RFUxK expansion card
Activate the expansion board by setting the parameter P.800 to 5.
The card can only be operated in controller variants -B, -CGH, -CXGH and -LGH.
Side view