MSD
TM
Series
© Copyright 2018 Fluid Equipment Development Company | www.fedco-usa.com
-
31
-
Figure 49 -
Pump Assembly Vertical Alignment
Pump Assembly Continued
Initial Pump Alignment
For horizontally mounted MSD units, pump alignment takes place in two stages;
Initial Pump Align
-
ment
and
Final Pump Alignment
. The
Initial Pump Alignment
procedure is used to make the
rough alignment adjustments. The
Final Pump Alignment
procedure is used to finalize the align
-
ment and assembly with the coupling installed. Pump vertical alignment is adjusted by rotating
the precision leveling foot adjustment nuts up and down.
Vertically mounted MSD pumps do not require initial or final alignment procedures as they do not
utilize precision leveling feet. Please skip these alignment procedures if applicable.
2
3
4
5
6
8
7
1
Figure 48 - Precision Leveling Foot Components
Item
Description
1
Threaded rod
2
Top nut
3
Flat washer
4
Stage bracket
5
Adjustment nut
6
Jam nut
7
Jam nut
8
Leveling foot frame