Installation Procedures Continued
Optional Horizontal Baseplate Installation
Some units include an optional FEDCO baseplate which provides good mounting surfaces for the
motor and pump. It also increases accuracy during the alignment process. Although the base
-
plate is precisely manufactured, it requires a solid foundation such as a concrete pad or rigid
steel substructure. If the optional baseplate is used, it must be installed first to avoid distortion
which may occur due to uneven floors or substructure. If the pump is installed within a container,
it must be mounted on a rigid steel substructure that will not distort under the weight of the equip
-
ment or from torque reaction forces during pump operation.
1
1
2
2
3
4
2
5
5
Item Description
Item Description
1
Motor mounting (4 to 6 depending on motor)
4
Precision leveling foot mounting plate
2
Lateral jacking plates
5
Baseplate mounting feet
3
In-line jacking plate
Figure 16 - Optional Horizontal Baseplate
Optional Vertical Baseplate Installation
Some units include an optional FEDCO base
-
plate which provides good mounting surfaces
for the motor and pump. It also increases accu-
racy during the alignment process. Although the
baseplate is precisely manufactured, it requires
a solid foundation such as a concrete pad or
rigid steel substructure. If the optional baseplate
is used, it must be installed first to avoid distor
-
tion which may occur due to uneven floors or
substructure.
Item
Description
1
Motor mounting
2
Motor adapter mounting
3
Vertical support brace
4
Baseplate mounting pad
1
2
3
4
Figure 17 -
Optional Vertical Baseplate