![FE FSH Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/fe/fsh/fsh_instruction-manual_3753975040.webp)
- 32 -
INF-TN1FSH-E
(2) Mounting
the
sensor
Use sensor FSW50 for large-diameter pipes.
Note: Mount the sensor unit equipped with a temperature sensor on the upstream side.
(1) Checking the mark-off line
“In the case of 1 measurement line”
Draw a horizontal mark-off line that
includes the center point of the cross
sectional view of the pipe.
“In the case of 2 measurement lines”
Draw a mark-off lines at an angle
±
45
°
from the horizon.
(2) Provide a wire rope for the sensor unit on the
upstream and downstream sides and the absorber
unit. Allow the length of the wire rope to be the
same or longer than the pipe diameter.
(3) Lay the wire rope around the pipe on the upstream
side. Then hang the spring for mounting on the
wire rope.
(4) Loosen the screws of the guide plates mounted to the
front and the rear of the sensor unit, keep the guide
plates protruded as far as possible, and make the
sensor unit closely contact the piping. In a state
where the guide plate contacts the piping, fasten it
with the screws.
Front
Rear
Mark-off line
Mark-off
line
45
°
45
°
Mark-off line
Mark-off line
Screw
Guide plate
Screw
Guide plate
Fasten the
guide plate
at the
position
where it
contacts the
piping.