![FE FSH Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/fe/fsh/fsh_instruction-manual_3753975035.webp)
INF-TN1FSH-E
- 27 -
(2)-2 Mounting the Frame
(1) Checking the mark-off line
“In the case of 1 measurement line”
Draw a horizontal mark-off line that
includes the center point of the cross
sectional view of the pipe.
“In the case of 2 measurement lines”
Draw a mark-off lines at an angle
±
45
°
from the horizon.
(2) Wrap the stainless belt around the pipe.
(3) Lift the screw of the stainless belt and let the tip of
the belt run through it.
(4) Place the frame so that the marking line and the “
$
”
mark on the frame end are aligned, and then fasten it
with a band.
Mark-off line
Mark-off
line
45
°
45
°
Mark-off line
Mark-off line
Marking
line
Align the "
▽
" mark with
the marking line.