
Miscellaneous
4812164501.pdf
2021-05-06
Weight: see the machine plate on the
roller
Fig. Four-point lift of the roller
1. Machine plate
1
Lifting the roller
The maximum weight of the machine (5) can be
read on the machine plate (1).
The maximum weight of the machine (5) can be
read on the machine plate (1).
Lifting equipment such as chains, steel wires,
straps and lifting hooks must be dimensioned in
accordance with the relevant safety regulations
for the lifting equipment.
Lifting equipment such as chains, steel wires,
straps and lifting hooks must be dimensioned in
accordance with the relevant safety regulations
for the lifting equipment.
Stand well clear of the hoisted machine! Make sure
that the lifting hooks are properly secured.
Stand well clear of the hoisted machine! Make sure
that the lifting hooks are properly secured.
The machine must not be lifted with chips in the
chip spreader.
The machine must not be lifted with chips in the
chip spreader.
5
Fig. Four-point lift of the roller - Rear
forks
1. Location of the lifting hook
1
1
Fig. Four-point lift of the roller - Front
forks
1. Location of the lifting hook
86
Содержание Dynapac CC1100 VI
Страница 2: ......
Страница 18: ...Introduction 4812164501 pdf 2021 05 06 4 ...
Страница 28: ...Special instructions 4812164501 pdf 2021 05 06 14 ...
Страница 48: ...Machine description 4812164501 pdf 2021 05 06 34 ...
Страница 53: ...Machine description 4812164501 pdf 2021 05 06 4812129673 Warning CALIFORNIA Proposition 65 39 ...
Страница 96: ...Operation 4812164501 pdf 2021 05 06 82 ...
Страница 118: ...Operating instructions Summary 4812164501 pdf 2021 05 06 104 ...
Страница 124: ...Maintenance Lubricants and symbols 4812164501 pdf 2021 05 06 110 ...
Страница 133: ...Maintenance Maintenance schedule 4812164501 pdf 2021 05 06 Service Checklist 119 ...
Страница 134: ...Maintenance Maintenance schedule 4812164501 pdf 2021 05 06 120 ...
Страница 144: ...Maintenance 10h 4812164501 pdf 2021 05 06 130 ...
Страница 162: ...Maintenance measures 250 h 4812164501 pdf 2021 05 06 148 ...
Страница 192: ...and 37 kW and Stage V 37 kW Maintenance measures 1500 h only Tier 4f Stage V 28 kW 4812164501 pdf 2021 05 06 178 ...
Страница 210: ...Maintenance 2000h 4812164501 pdf 2021 05 06 196 ...
Страница 233: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...