3.5 Loading/transporting the machine
Use only stable loading ramps of sufficient load
bearing capacity.
Loading ramps and transport vehicle must be
free of grease, oil, snow and ice.
The ramp inclination must be less than the gra-
deability of the machine.
Make sure that persons are not endangered by
the machine tipping or sliding off. The
instructing person must stand within view of the
operator, but outside the danger zone.
Secure the machine with the articulation lock
after driving it onto the transport vehicle or
before loading it with a crane.
Do not use lashing points that are damaged or
impaired in any way.
Always use appropriate lashing tackle at the
lashing points.
Use lashing tackle only in the specified loading
direction.
Lashing tackle must not be damaged by
machine parts.
Secure the machine on the transport vehicle
against rolling, slipping and turning over.
Loads may only be attached and hoisted by an
expert/qualified person.
Only use lifting and lashing tackle with suffi-
cient load bearing capacity for the weight to be
loaded.
Fasten the lifting tackle only at the specified
lifting points.
Danger to the life of persons if they step or
stand under a suspended load.
When lifting the machine, make sure the load
does not move in an uncontrolled way. If nec-
essary, hold the load steady with guide ropes.
Concerning your safety – Loading/transporting the machine
BW 120 AD-5
39
Содержание BOMAG BW 120 AD-5
Страница 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Страница 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Страница 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Страница 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Страница 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Страница 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Страница 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Страница 97: ...6 Operation Operation BW 120 AD 5 97 ...
Страница 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Страница 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Страница 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Страница 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Страница 182: ...8 Turn the ignition key to position 0 and pull it out B ELE 0069 Fig 162 Maintenance As required BW 120 AD 5 182 ...
Страница 190: ...Maintenance As required BW 120 AD 5 190 ...
Страница 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Страница 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Страница 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Страница 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Страница 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Страница 209: ......
Страница 210: ......