6.6.5 Stop working with vibration
1.
Switch the vibration off.
2.
Turn the rotary switch for vibration pre-
selection to position “Middle”.
6.6.6 ECONOMIZER
The ECONOMIZER continuously informs the
driver about the compaction status of the road
subbase or the asphalt layer and enables the
detection and selected re-compaction of weak
spots.
The acceleration transducer on the front drum
measures the reaction of the road subbase on
the vibrating drum.
The ECONOMIZER is automatically started by
switching the ignition on.
The ECONOMIZER first of all runs an LED-
test. The LEDs light up one after the other,
starting with LED (1). Once all LEDs are on,
the display goes out again in single steps.
B-SWI-1485
Fig. 82
Start process
Operation – Working with vibration
BW 120 AD-5
110
Содержание BOMAG BW 120 AD-5
Страница 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Страница 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Страница 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Страница 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Страница 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Страница 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Страница 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Страница 97: ...6 Operation Operation BW 120 AD 5 97 ...
Страница 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Страница 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Страница 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Страница 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Страница 182: ...8 Turn the ignition key to position 0 and pull it out B ELE 0069 Fig 162 Maintenance As required BW 120 AD 5 182 ...
Страница 190: ...Maintenance As required BW 120 AD 5 190 ...
Страница 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Страница 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Страница 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Страница 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Страница 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Страница 209: ......
Страница 210: ......