![Fayat BOMAG BW 120 AD-5 Скачать руководство пользователя страница 151](http://html1.mh-extra.com/html/fayat/bomag-bw-120-ad-5/bomag-bw-120-ad-5_operating-instruction_3685466151.webp)
4.
Thoroughly clean the outside of the oil filter
cartridge.
5.
Unscrew the oil filter cartridge using an
appropriate strap wrench.
6.
Remove any dirt from the sealing face of
the filter carrier.
7.
Thinly apply oil to the rubber seal of the
new oil filter cartridge.
8.
Screw on the oil filter cartridge and tighten
by hand.
9.
Fill in fresh engine oil through the filler
opening (2).
10.
After a short test run check the oil level on
the oil dipstick (1), if necessary top up to
the “MAX” mark.
11.
Check oil filter cartridge and drain plug for
leaks.
12.
Dispose of the oil and filters in line with
environmental regulations.
8.8.2 Checking, tensioning the V-belt
8.8.2.1 Checking the V-belt
Protective equip-
ment:
n
Working clothes
n
Protective gloves
1.
Park the machine in secured condition
Chapter 6.8 ‘Parking the machine in
secured condition’ on page 114
2.
Allow the engine to cool down.
B-880-0108
Fig. 120
MIN
MAX
2
1
B-880-0083
Fig. 121
Maintenance – Every 250 operating hours
BW 120 AD-5
151
Содержание BOMAG BW 120 AD-5
Страница 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Страница 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Страница 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Страница 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Страница 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Страница 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Страница 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Страница 97: ...6 Operation Operation BW 120 AD 5 97 ...
Страница 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Страница 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Страница 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Страница 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Страница 182: ...8 Turn the ignition key to position 0 and pull it out B ELE 0069 Fig 162 Maintenance As required BW 120 AD 5 182 ...
Страница 190: ...Maintenance As required BW 120 AD 5 190 ...
Страница 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Страница 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Страница 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Страница 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Страница 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Страница 209: ......
Страница 210: ......