![Fayat BOMAG BW 120 AD-5 Скачать руководство пользователя страница 145](http://html1.mh-extra.com/html/fayat/bomag-bw-120-ad-5/bomag-bw-120-ad-5_operating-instruction_3685466145.webp)
8.5 Running-in instructions
8.5.1 General
The following maintenance work must be per-
formed when running in new machines or over-
hauled engines.
NOTICE!
Danger of engine damage!
– Up to approx. 250 operating
hours check the engine oil level
twice every day.
Depending on the load the engine is
subjected to, the oil consumption
will drop to the normal level after
approx. 100 to 250 operating hours.
8.5.2 After 50 operating hours
1.
Check the engine for leaks.
2.
Tighten all bolted connections on air intake,
exhaust, oil sump and engine mounts
3.
Retighten the bolted connections on the
machine.
Maintenance – Running-in instructions
BW 120 AD-5
145
Содержание BOMAG BW 120 AD-5
Страница 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Страница 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Страница 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Страница 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Страница 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Страница 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Страница 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Страница 97: ...6 Operation Operation BW 120 AD 5 97 ...
Страница 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Страница 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Страница 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Страница 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Страница 182: ...8 Turn the ignition key to position 0 and pull it out B ELE 0069 Fig 162 Maintenance As required BW 120 AD 5 182 ...
Страница 190: ...Maintenance As required BW 120 AD 5 190 ...
Страница 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Страница 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Страница 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Страница 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Страница 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Страница 209: ......
Страница 210: ......