8.10 Every 1000 operating hours
8.10.1 Checking, adjusting the valve clearance
NOTICE!
Danger of engine damage!
We recommend to have this work
carried out by trained personnel or
our after sales service.
– Before checking the valve clear-
ance let the engine cool down for
at least 30 minutes. The engine
oil temperature must be below
80 °C (176 °F).
Valve clearance
Intake / exhaust
valve
0.18 mm to 0.22 mm
(0.007 in to 0.009 in)
Protective equip-
ment:
n
Working clothes
n
Safety shoes
n
Protective gloves
1.
‘Parking the machine in secured condition’
.
2.
Allow the engine to cool down.
3.
Remove the valve cover.
Fig. 132
Maintenance – Every 1000 operating hours
BW 120 AD-5
161
Содержание BOMAG BW 120 AD-5
Страница 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Страница 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Страница 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Страница 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Страница 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Страница 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Страница 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Страница 97: ...6 Operation Operation BW 120 AD 5 97 ...
Страница 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Страница 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Страница 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Страница 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Страница 182: ...8 Turn the ignition key to position 0 and pull it out B ELE 0069 Fig 162 Maintenance As required BW 120 AD 5 182 ...
Страница 190: ...Maintenance As required BW 120 AD 5 190 ...
Страница 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Страница 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Страница 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Страница 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Страница 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Страница 209: ......
Страница 210: ......