![Fayat BOMAG BW 120 AD-5 Скачать руководство пользователя страница 105](http://html1.mh-extra.com/html/fayat/bomag-bw-120-ad-5/bomag-bw-120-ad-5_operating-instruction_3685466105.webp)
6.5 Driving the machine in public traffic
The machine must be equipped for driving in
public traffic.
Driving in public traffic is not permitted without
additional equipment (e.g. lighting, first aid kit,
warning triangle).
Observe national regulations!
1.
Park the machine in secured condition.
Chapter 6.8 ‘Parking the machine in
secured condition’ on page 114
2.
Check the lighting.
3.
Switch off the working lights.
4.
Fasten your seat belt.
5.
Set the throttle lever to position “MAX I”.
6.
Before starting to drive make sure that the
driving area is absolutely safe.
7.
Disengage the travel lever to the left out of
parking brake position and move it slowly
to the required travel direction.
ð
The further the travel lever is moved for-
wards or backwards, the faster the
machine will travel.
Stick to the maximum speed of
8 km/h (5 mph).
8.
Set the travel lever to “Middle” position to
stop the machine.
ð
The machine decelerates to a standstill.
MIN.
MAX II
MAX I
B-880-0160
Fig. 74
B-ELE-0262
Fig. 75
Operation – Driving the machine in public traffic
BW 120 AD-5
105
Содержание BOMAG BW 120 AD-5
Страница 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Страница 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Страница 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Страница 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Страница 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Страница 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Страница 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Страница 97: ...6 Operation Operation BW 120 AD 5 97 ...
Страница 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Страница 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Страница 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Страница 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Страница 182: ...8 Turn the ignition key to position 0 and pull it out B ELE 0069 Fig 162 Maintenance As required BW 120 AD 5 182 ...
Страница 190: ...Maintenance As required BW 120 AD 5 190 ...
Страница 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Страница 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Страница 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Страница 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Страница 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Страница 209: ......
Страница 210: ......