Operation
4812159701_D.pdf
2021-03-16
Vibration
Manual/Automatic vibration
1
2
4
3
Fig. Control panel
1. Automatic vibration control (AVC)
2. Switch, vibration On/Off
3. Rpm switch
4. Working mode
Activate the button for the Working mode (4).
Manual or automatic vibration activation/deactivation is
selected using button (1).
In the manual position the operator has to activate the
vibration via the bottom left switch on the
forward/reverse lever (2).
In automatic mode (AVC), vibration is activated when
the speed is ≥ x km/h (... mph) and turns off at a speed
of x km/h (...mph)
Activation of vibration for the first time, as well as
disconnection of automatic vibration, are performed
with the switch (2) on the forward/reverse lever.
Note that vibration can only be activated when the
working mode (4) is activated, and when the Rpm
switch (3) for the engine is in high (HI) or Eco
mode (ECO). After 10 seconds in neutral, the
vibration is switched off and the machine drops to
low speed.
Manual vibration - Switching on
1
Fig. F/R lever
1. Vibration ON/OFF
Never activate vibration when the roller is
stationary. This can damage both the surface and
the machine.
Never activate vibration when the roller is
stationary. This can damage both the surface and
the machine.
Engage and disengage vibration using the switch (1)
on the front of the forward/reverse lever.
Always switch off vibration before the roller comes to a
standstill.
When compacting thin layers of asphalt up to approx.
50 mm (2 inches) thick, the best results are achived
with low amplitude/high frequency.
74
Содержание DYNAPAC CC224C
Страница 2: ......
Страница 16: ...Introduction 4812159701_D pdf 2021 03 16 4...
Страница 26: ...Special instructions 4812159701_D pdf 2021 03 16 14...
Страница 43: ...Machine description 4812159701_D pdf 2021 03 16 4812129673 Warning CALIFORNIA Proposition 65 31...
Страница 90: ...Operation 4812159701_D pdf 2021 03 16 78...
Страница 104: ...Preventive maintenance 4812159701_D pdf 2021 03 16 92...
Страница 124: ...Maintenance 10h 4812159701_D pdf 2021 03 16 112...
Страница 128: ...Maintenance 50h 4812159701_D pdf 2021 03 16 116...
Страница 168: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...