23
4.6 INSTALLING CONTROLLERS
A chemical circuit sprayer control box, a boom
position switch box and foam marker toggle switch
should be mounted in the tractor cab.
1.
Chemical Circuit Control Box:
The control box is equipped with a "U" bracket
secured by knobs on each end of the box. It
provides a universal mounting system adaptable
to any confi guration.
Use the two holes provided in the bracket to
mount to the box to a solid surface. Position the
box to face the operator and tighten the knobs
to hold the box in position.
Cut the power cable to the required length. Con-
nect the white wire to ground and the red wire
to a 12 volt battery or 12v power port. Refer to
Controller Manual. Panel fuse is a AGC-15 amp.
IMPORTANT
Do not connect across a 24 volt sys-
tem. It will damage internal electri-
cal components.
2.
Boom Position Switch Box:
Mount the box next to the sprayer controller to
allow easy access. Connect to 12 volt power port.
Box fuse is a AGC-10 amp.
Plug the wiring harness from the 3 Point boom
into plug on pigtail that comes from boom posi-
tion switch box. Making sure to properly index
connector.
Fig. 13 CONTROLLER (TYPICAL)
Fig. 14 BOOM POSITION SWITCH BOX
Содержание 973P Series
Страница 1: ...1 HIGH CLEARANCE CENTER PIVOT SUSPENDED BOOM 3 PT FIELD SPRAYER 973P SERIES OPERATOR S MANUAL...
Страница 45: ...45 Fig 62 BOOM TILT PIVOT 3 Grease boom tilt pivot 1 location each boom Left Right...
Страница 59: ...59 7 4 ELECTRICAL SCHEMATIC OPTIONAL CABLE 10 CONSOLE 3 OR 6 BOOM SCS 440 450 CONSOLES...
Страница 60: ...60 7 5 OPTIONAL CABLE FLOW CONTROLLER UP TO 6 BOOM VALVES...
Страница 61: ...61 7 6 5 FUNCTION HYDRAULIC BLOCK PARTS Note for open center systems only install plug 10 for closed center...
Страница 62: ...62 7 7 5 FUNCTION HYDRAULIC CAB BOX...
Страница 63: ...63 7 8 5 FUNCTION HYDRAULIC CAB BOX SWITCH WIRING...
Страница 67: ...67...