background image

FAITHTECH

FTB9000 USER MANUAL

64

4.3.Communication interface

4.3.1.USB

serial port

FTB9000 provides a USB virtual serial port communication, compatible with

WindowsXP/7/8/10 and other operating systems, the specific driver and installation

instructions, please see "CD and PC user manual".

The default rate of virtual serial port is 9600bps. The check mode is None, and the flow control

mode is not supported.

Using USB-B port, users can use random distribution of USB communication cable, easy

connection with PC USB port. Its pin signal is described in the following table.
Table 4- 1USB interface signal

Pin NO.

Description

1

5V equipment

2

Data-

3

Data+

4

GND

4.3.2.LAN

The FTB9000 series devices have Ethernet communication interfaces and adopt

UDP communication mode. The default IP address is 192.168.1.123, subnet mask is
255.255.255.0, and port number is 7000.

Note: Before communication, ensure that the IP addresses of the PC and the

device are in the same network segment, and ensure that there are no duplicate IP
addresses with the device in the network segment; otherwise, the connection fails.

4.3.3.CAN

The CAN interface is fixed with 500kbps communication speed, and the

communication address can be set from 0 to 255.

Note: CAN interface is fixed using CANOpen communication protocol.

CAN communication connection is shown below

Содержание FTB9000 Series

Страница 1: ...Faithtech Wide range high power Bidirectional programmable DC power supply User manual FTB9000 series All rights reserved Faithtech versionV1 00 2022 01...

Страница 2: ...s instrument fully meet the technical indicators claimed in the manual and the raw materials and manufacturing processes used in this product are strictly checked to ensure that the product is stable...

Страница 3: ...reliably grounded to prevent electric shock 3 phase 380VAC Input The input wire meets the specified standards Be sure to install a protective cover to prevent electric shock Output terminal cable conn...

Страница 4: ...IV...

Страница 5: ...FAITHTECH FTB9000 USER MANUAL I Revised version record date version Chapter of Revision 2021 March 1 0 Complete this manual...

Страница 6: ...le devices input connection 2 7 3 Positive and negative extreme port connection 2 7 4 Voltage compensated connection 2 7 5 Energy feedback connection 2 7 6 Composite signal port connection 3 Function...

Страница 7: ...w drop function RAMP 51 3 17 Charge and discharge function 3 18 Simulating battery function 3 19 Master and slave parallel machine function 3 19 1 Master slave parallel connection 3 19 2 Master slave...

Страница 8: ...d with rich communication programming interface and color screen and a variety of text menu interface easy to operate and intuitive power electronics new energy sensor motor drive system integration a...

Страница 9: ...er comprehensive protection function With high voltage isolation digital analog monitoring interface Standard LAN USB serial port optional GPIB CAN RS485 communication interface Support SCPI Modbus CA...

Страница 10: ...FAITHTECH FTB9000 USER MANUAL 3 1 3 Overall dimensions 1 3 1 5kW 10kW 15kW 1 1 5kW 15kW model size...

Страница 11: ...FAITHTECH FTB9000 USER MANUAL 4 1 3 2 20kW 25kW 30kW 1 2 20kW 30kW model size...

Страница 12: ...80 800 75 Voltage 0 80V 0 300V 0 500V 0 800V Current 450 450A 225 225A 120 120A 75 75A Resistance 0 006 35 0 1 266 0 16 833 0 4 2k Power 15 15kW 18 18kW Model FTB9300 80 900 FTB9360 300 450 FTB9360 50...

Страница 13: ...W 126 126kW Model FTB91200 80 3600 FTB91440 300 1800 FTB91440 500 960 FTB91440 800 600 Voltage 0 80V 0 300V 0 500V 0 800V Current 3600 3600A 1800 1800A 960 960A 600 600A Resistance 0 001 4 4 0 013 33...

Страница 14: ...le p p 5kW 160mV 300mV 450 mV 800 mV 10kW 320mV 300 mV 450 mV 800 mV 15kW 320 mV 300 mV 450 mV 800 mV Voltage ripple rms 5kW 16mV 40mV 70 mV 200mV 10kW 25 mV 40 mV 70 mV 200 mV 15kW 25 mV 40 mV 70 mV...

Страница 15: ...B9120 1000 40 FTB9120 1500 25 Voltage 0 1000V 0 1500V Current 40 40A 25 25A Resistance 1 5k 2 25 11k Power 12 12kW 12 12kW FTB9180 1500 40 FTB9180 2250 25 0 1500V 0 2250V 40 40A 25 25A 1 5 7 5k 3 6 18...

Страница 16: ...84 84kW 126 126kW Model FTB9960 1000 320 FTB91440 1500 320 FTB91440 2250 200 Voltage 0 1000V 0 1500V 0 2250V Current 320 320A 320 320A 200 200A Resistance 0 125 625 0 188 938 0 45 2 25k Power 96 96kW...

Страница 17: ...surement accurancy 1 F S Output noise ripple Voltage ripple Vpp 10kW 1600mV 15kW 2400mV 3600mV Voltage ripple rms 10kW 350mV 15kW 400mV 400mV Voltage rising slope Maximum slope 40000V s Voltage drop t...

Страница 18: ...With output shield 20kW 36kW 482 6mm x 266 0mm x 767 0mm With output shield weight 5kW 18kg 10kW 25kg 15kW 32kg 36kW 65kg Note 1 Accuracy measurement conditions 25 5 2 Linear adjustment rate measureme...

Страница 19: ...tion terminal 2PIN 3 81mm 1PCS Master and slave parallel wiring terminals USB Communication line 1PCS CONNECT PC USB LAN Wire of connection 1PCS CONNECT PC LAN User manual 1PCS Includes installation a...

Страница 20: ...button Basic key function Table 2 2Key function table item symbol instructions 1 Voltage setting key Press this key to switch from other functions to voltage setting function and enter voltage editing...

Страница 21: ...ed value of charge and time 8 System Menu key Press this key to enter the system menu 9 Multiple use key 10 to and Number key and decimal point key 11 Digital clear key 12 Used to move or select Setti...

Страница 22: ...meters display area introduction The parameter echo area is used to display information such as sampling voltage current power and measurement results In different functions the echo parameters will b...

Страница 23: ...led E VIP Protection indication Blank no protection occurs PMF OVP OCP OPP OTP LVP OP OC OV RVP CMF mode CV CC CP CR Off Operation tips Introduction of functional parameter setting area Set the test p...

Страница 24: ...te 2 6 2 Enter requirements FTB9000 series equipment power supply input connection please pay attention to the following items 1 Three phase input 340VAC 480VAC 47 63Hz 2 Ensure reliable grounding 3 3...

Страница 25: ...wait 5 seconds before entering the application screen Note For the description of self test faults see Table 5 2 Self check Table for Startup Faults 2 7 Connection mode 2 7 1 Input connections The us...

Страница 26: ...5kW 6kW or 10kW models are connected to the grid and it is suggested to evenly distribute the access points as shown in the following figure When the 15kW model is connected to the three phase power g...

Страница 27: ...he and end of the rear panel of equipment connected to the device under test When connecting pay attention to the wire diameter length and polarity of the cable To avoid the safety accidents caused by...

Страница 28: ...onnection FTB9000 series devices have automatic line loss compensation capability to compensate for voltage drops caused by cables and contact resistors Use the V Sense voltage compensation sampling t...

Страница 29: ...ge models is less than 5V For special requirements please consult your dealer or Faith Technology Technical Department 2 7 5 Energy feedback connection FTB9000 series products not only realize the loa...

Страница 30: ...ut indicator signal Photo 2 12Composite signal terminal Table 2 4Compound signal function description pin Name I O instructions 1 Ready Output Device working status indicator port 5V TTL level H fault...

Страница 31: ...current input port Input range 0 to 5V or optional 0 to 20mA Corresponding to the device source or load control current 0 to the source or load rated current 10 AGND Analog ground 11 V Set Input Anal...

Страница 32: ...e CV constant voltage CC constant current CP constant power three working modes in both source and load states In CV constant voltage mode the status bar of the main interface displays CV and the DC p...

Страница 33: ...e user with the display functions such as parameter viewing measurement display and status indication Some parameters can be set only in local mode including system language Serial port baud rate and...

Страница 34: ...s to 10000A s The default value is 2000A s Source current Source current rising slope configuration The value ranges from 0 0006A s to 10000A s The default value is 2000A s Load current Load current...

Страница 35: ...ationary state sets the voltage lower limit Default 0 is unlimited Load current Limit stationary state sets the voltage upper limit Default Maximum input current Load current Limit stationary state se...

Страница 36: ...nd select the System item press The submenu pops up as following table Table 3 2system Menu table communication setting IP address Default 192 168 1 123 Subnet mask Default 255 255 255 0 Serial port r...

Страница 37: ...menu pops up The edit item is used for sequence editing see 3 12 Sequence Output Function SEQ for details 3 3Edit menu list sequence file sequence file Sequence file number selection range 1 to 10 ret...

Страница 38: ...utton again Make the input value valid After restoring the factory Settings the voltage setting value defaults to 0V Current setting Under the stationary functional interface press button to Enter the...

Страница 39: ...ion When the upper and lower limits are set to non 0 the voltage current and power parameters under the steady state output function can be set between the upper and lower limits If the input number e...

Страница 40: ...aveform and can effectively avoid the impact of the output on the measurement object 1 press button enter menu setting interface 2 select setting Application Settings Sub menu press buttonto enter App...

Страница 41: ...the device can be forced to run in CC mode or CV mode at the moment of startup To avoid current or voltage spikes caused by users using capacitive or inductive loads loads Photo 3 4 CV priority and CC...

Страница 42: ...screen shows the output switch status and the user can also observe whether the output is turned on by pressing the indicator light 3 8 Introduction of external monitoring functions 3 8 1 Monitoring f...

Страница 43: ...n The source load rated voltage current and power of the device can be set by external 0 5V DC voltage signal which is connected as shown below 3 8Composite port simulation programming wiring mode Sim...

Страница 44: ...amming sub menu press button to enter External programming interface as following 3 10 External programming setting interface 3 Select Voltage programming current programming and power programming to...

Страница 45: ...et is valid for both source and load control power and the set value is the same 3 8 3 External control function FTB9000 composite signal port provides a trigger signal input port Inhibit which is con...

Страница 46: ...operation 1 press button enter menu setting interface 2 select setting External programming sub menu press button to enter External programming interface as following 3 8 3 select External control pr...

Страница 47: ...output The screen shows the specific protection content while the buzzer emits an alarm 1 Press button enter menu setting interface 2 select setting Protection setting Sub menu press button to enter...

Страница 48: ...of overcurrent protection for users to set The related configuration items refer to the protection Settings of Menu Configuration Set to 0 means to turn off software overcurrent protection When the ou...

Страница 49: ...trol the device output time when the device output open time reaches the set time the device automatically shut down Output time setting range 0 99999s set 0 to turn off this function This function is...

Страница 50: ...to effect Save the parameters to storage location 2 7 press button enter call interface 8 Enter the number 1 press buton to Put it into effect The parameter of position 1 will be called and the device...

Страница 51: ...r down saving is turned on the device will restore the parameters of the last shutdown when it is powered on otherwise the device will be initialized to the default parameters 1 press button enter men...

Страница 52: ...4Sequence parameter description table Parameter name Description of parameters File length SEQ file running steps ranging from 1 to 100 Running times Set the number of sequence file loop runs ranging...

Страница 53: ...ress button to Enter the sequence file selection screen 3 Turn the knob or enter a number to select the file number you want to edit press button to enter editing files screen Photo 3 13Sequence file...

Страница 54: ...the next item load currentr 12 set load current press button to confirm The edit focus automatically moves to the next item load power 13 set load power press button to confirm The edit focus automati...

Страница 55: ...creen 3 select File number press button to put it into effect 4 press button to Start sequence testing screen Step The data is shown as the current running step of the sequence Cycle The data shown ar...

Страница 56: ...button to confirm Set the values of source current source power load current load power to the rated value of the device and the value of single step delay to 1s as described above After completion i...

Страница 57: ...e knob select Wave press button Enable the waveform function the screen shows the Wave screen Photo 3 16Sequence test running screen 3 Scroll the knob select Wave press button Enable the waveform func...

Страница 58: ...meter setting 3 Set CR test parameters 4 press button to Turn on the output Table 3 5Constant resistance function parameter description table Parameter name Description of parameters Resistance settin...

Страница 59: ...e parameters are described in Table 3 6 voltage slow rise and slow fall function parameters 4 press button Start RAMP function output Table 3 6Voltage slow rise and slow fall function parameter descri...

Страница 60: ...er setting Follow the above steps of RAMP function to enter the parameter setting interface Complete the configuration of the voltage at each point and the slope value required by the voltage section...

Страница 61: ...tion Table name Description of parameters Charging voltage Charging voltage setting value range 0 maximum voltage value Charging current Charging current set value range 0 maximum current value Chargi...

Страница 62: ...DSIC FTB9000 series products not only have the function of charging but also can be used to discharge the battery super capacitor and other products Operation steps 1 press button Enter the Test funct...

Страница 63: ...nation time Discharge completion judgment time value range 0 99999s Note 1 Discharge completion judgment conditions such as termination voltage termination power termination time if one of the conditi...

Страница 64: ...pansion of the same model The user connects the Share signal interface in the rear panel the RS485 parallel communication interface in the composite signal port and the positive and negative output po...

Страница 65: ...pair Master slave parallel connection Note 1 The master slave parallel machine only supports the parallel connection of the same type of equipment 2 The maximum number of parallel machines is 10 3 If...

Страница 66: ...ise the communication will fail The device is set as a slave and the screen will automatically hide the unnecessary configuration items after returning to the main interface Host Settings Photo 3 20Ma...

Страница 67: ...shut down all device outputs The slave displays the specific fault information and the host displays the fault information of the host and the fault slave code as shown in the following figure Photo...

Страница 68: ...ost 2 If multiple devices are set as hosts and the parallel function is enabled the parallel operation fails 3 If the signal cable of the Share port of the slave machine is not connected or falls off...

Страница 69: ...1Communication parameter setting interface 3 For LAN communication the default IP address is 192 168 1 123 and the default subnet mask is 255 255 255 0 Secondly it is necessary to set the IP address o...

Страница 70: ...modification takes effect only after the device is restarted 4 2 Voltage and current acquisition rate After the above communication configuration is completed if the user needs to improve the speed of...

Страница 71: ...able Table 4 1USB interface signal Pin NO Description 1 5V equipment 2 Data 3 Data 4 GND 4 3 2 LAN The FTB9000 series devices have Ethernet communication interfaces and adopt UDP communication mode Th...

Страница 72: ...SCPI or D The GPIB interface supports only SCPI protocol and the CAN interface supports only CANopen protocol 4 4 1 SCPI protocol Standard Commands for Programmable Instruments Programmable Instrument...

Страница 73: ...mmand can contain multiple mnemics and the nodes of the command tree are separated by the character as shown below The ROOT at the top of the command tree is called root The full path from the root to...

Страница 74: ...ers Note FTB9000 series devices only support RTU communication mode For details about Modbus protocol please refer to FTB9000 Programming Manual Modbus Edition 4 4 3 CANopen protocol CANopen is a high...

Страница 75: ...FAITHTECH FTB9000 USER MANUAL 68...

Страница 76: ...han the requirements of the device 2 devicePMF is triggered by a power failure 1 Check whether the power grid is normal 2PMF fault triggered by power failure can be ignored Over temperature protection...

Страница 77: ...rror Failed to load system parameters 6 Appendix Table 6 1 Recommended cable diameters Model Cross secti onal area Different temperature conditions AWG mm2 60 75 85 90 Wire type RUW T UF Wire type RHW...

Отзывы: