FAITHTECH
FTB9000 USER MANUAL
46
from 0 to the maximum load power
Single-step
delay
The delay of the current step, ranging from 0.001 to
99999s. The delay starts from the moment when the
voltage, current and power of the current step reach
the set value
。
Edit sequence file
1. press
button
,
enter menu setting screen
;
2. select“edit”->“sequence file”
,
press
button to Enter the sequence file
selection screen
;
3. Turn the knob or enter a number to select the file number you want to edit
,
press
button to enter editing files screen
;
Photo 3- 13Sequence file editing screen
4. set“Length of file”
,
press
button to confirm
,
The edit focus automatically
moves to the next item, "number of runs";
5. set“Number of runs”
,
press
button to confirm
;
The edit focus automatically
moves to the next item, "link files";
6.
7. set“link files”
,
press
button to confirm
,
The edit focus automatically moves
to the next item, "edit steps";